Forum quick links
NAUF Going Forward
NC-v4 EQc2:Low emitting materialsposted by Mike Miller on
Has USGBC taken into consideration the overlap for the Low-Emitting Materials categories with v2009 (NAUF) and v4 General Emission Standard (GES) and whether or not they would allow the GES certifi
Carpool Requirement
NC-v4 LTc7:Reduced parking footprintposted by Sarah Nugent on
Hi There, We're working on a high rise condo in Manhattan that is providing very limited parking (18 spaces for 330 residents).
Air-supply plenum
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Gustav Alfaro on
For an office application we have an air-supply plenum for conditioning the space, what is the maximum content of VOC allowed for the plenum sealing material? Thanks in advance.
Construction Submittal Deadline
posted by M Bordeaux on
Is the cutoff of "(2) years past substantial project completion" for construction review submittal strictly enforced? "Following completion of the Design Review phase and within 2 (two) years of s
CONFUSED IN EAP2 STRATEGY FOR A MASTER SITE PROJECT
NC-2009 EAp2:Minimum Energy Performanceposted by VEL MUTHU on
Hello everyone, I am currently working on a project which consist of 8 buildings(3 main buildings and 5 supportive building, all are between 8000 to 60,000 sq ft), we are targeting certification le
minimum area requirement for energy modelling
NC-2009 EAp2:Minimum Energy Performanceposted by VEL MUTHU on
do we have any area requirement for energy modeling i.e. Minimum area to opt for Option 1 Whole building energy modeling aproach for EAP2?
Integrative Pilot Credit - Design or Construction Credit
Pilot-Credits PC60:Integrative Processposted by Devki Wright on
Hi there - when submitting the documentation for this credit, is this considered a design or construction credit?
LEED-GA as a student
posted by PRATIK KUMAR on
Hello everyone, Kindly help me out in providing a proper knowledge about LEED-GA exams as a student. As i am a working professional and doing my PG-Diploma in Urban planning as part time,and also i
new Alternative Compliance Path
posted by Tristan Roberts on
As we reported on BuildingGreen.com (see Dynamic Plaque Piloted as LEED Performance Path)
new ACP featuring Dynamic Plaque
posted by Tristan Roberts on
As we reported on BuildingGreen.com (see EBOM certification. From the article: