DAYLIT AREA Op-2NC-v4 EQc7: Daylightposted by Ale g on Nov 24, 2020, 8:38 am
Hi to All Experts, some opertaive clarifications will be really appreciate: pursuing the credit through option 2 1. Do I have to select for the whole building the worst case form... Last reply: Ale g, May 6, 2021, 11:05 am |
|
for option 3- take light meter measurements with lights on / off?NC-v4 EQc7: Daylightposted by Beth Brant on Apr 14, 2021, 11:52 am
Does anyone know if we are required to take light meter measurements with the interior lights on or off? I am assuming they need to be off but since the lighting has occupancy and daylighting... Last reply: Ale g, May 6, 2021, 10:41 am |
|
What if daylight/views are not allowed in a reasearch laboraty space?NC-v4 EQc7: Daylightposted by J Schütz on Apr 28, 2021, 11:56 am
Dear all, we are currently working on a research laboratory, which contains normal daylighted office spaces and enclosed laboratory spaces. The occupants will switch between their desk and... Last reply: Ale g, Apr 30, 2021, 3:11 am |
|
Adjusting for Daylight Saving TimeNC-v4 EQc7: Daylightposted by Ale g on Dec 12, 2020, 1:35 pm
Hi, When asked to taking into account daylight saving time to perform... |
|
Option 1 assessment for building with external movable elements, sDA and ASE assumptionsNC-v4 EQc7: Daylightposted by IASON BOURNAS on Nov 12, 2020, 7:09 am
Hi, we need to test compliance of an office building with the LEED v4 Daylight criteria (NC-v4 EQc7), following Option 1 (... |
|
Tolerance within the achievement of the criteria due to different affectationsNC-v4 EQc7: Daylightposted by Audrey LEDESERT on Jul 27, 2020, 7:35 am
Hi, I'm working on a project with administration affectation and some commercial surfaces on the groundfloor (surface < 40% of the total project surfaces). As the commercials... Last reply: Daniel Glaser, Jul 27, 2020, 8:52 am |
|
Vats in winery's production areaNC-v4 EQc7: Daylightposted by Ricardo Sá on Mar 18, 2020, 12:28 pm
Dear All, we are currently working on the LEED certification of a new winery that will be built in Portugal. The main wine production zone inside the building consists of a large... Last reply: Deborah Lucking, Mar 19, 2020, 11:28 am |
|
Auditorium, black box theatre, TV studioNC-v4 EQc7: Daylightposted by Kavita K on Aug 7, 2019, 11:11 am
Hi all, Last reply: Agnieszka Kaczmarek, Jan 16, 2020, 7:20 am |
|
Extrapolate daylight results for similar floorsNC-v4 EQc7: Daylightposted by Agnieszka Kaczmarek on Jan 2, 2020, 4:41 am
Illuminance simulations should be perform for all the regularly occupied spaces. What if I have 20-storeys building with same geometry and same layout? Simulating each floor seems pointless,... Last reply: Hariharan P, Jan 3, 2020, 11:12 pm |
|
Extent of daylight simulation modelNC-v4 EQc7: Daylightposted by Benjamin Weise on Oct 25, 2019, 9:12 am
Hi there! we are about to undertake the daylight simulation for a 50.000m² building. The way we understand the credit language, the whole building is to be simulated, except non regularly... Last reply: Benjamin Weise, Oct 31, 2019, 3:24 am |