Do outdoor terraces require entrway systems?

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Helene Lefkowitz  on 

Hello - I'm working on a commercial project that has an outdoor terrace on the second floor. Building occupants can use the terrace for outdoor seating and there will be a firepit.

1
Fri Dec 28, 2018, 2:16 pm

Entryway mats at roof terraces/ gardens and emergency staircase

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  ebru unver  on 

Hello, For our office project, we are providing permanently installed grilles,on the floor at the 2 main entrances and at the car parking floor before the elevators hall. 1-Do we need also mats for

5
Director of Sustainability
Fentress Architects
LEEDuser Expert
224 thumbs up
Wed Dec 26, 2018, 6:36 pm

Existing Canal

NC-v4 SSc4:Rainwater management
posted by  Heather Appell  on 

Can this credit be achieved if some of the rainwater collection is filtered into a canal bordering the project site? TIA!

0

Buildable land calculations

NC-v4 LTc4:Surrounding density and diverse uses
posted by  Ricardo Sá  on 

I would like to clarify which areas shall I include in Combined Density calculations, namely: 1) the buildable land (acres) refers to "portion of site where construction can occur".

4
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Fri Dec 21, 2018, 5:41 pm

Missing Performance Calculator

ND-Plan-v4 GIBp2:Minimum building energy performance
posted by  Katelyn Smith  on 

The language in the form asks us to "Provide the completed Minimum Energy Performance Calculator (found under the prerequisite's "Resources" tab in the

1
Fri Dec 21, 2018, 4:54 pm

Energy Star Equipment - UPS Systems

CI-2009 EAp2:Minimum Energy Performance
posted by  Rachel Manoguerra  on 

I received a general review comment back on this credit regarding the inclusion of the UPS system in our Energy Star Equipment table.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Dec 20, 2018, 10:24 pm

(Sample) Lease Agreement

CS-2009 EAp2:Minimum Energy Performance
posted by  Charalampos Giannikopoulos  on 

If no tenants have been identified can the project owner claim relevant energy saving from reduced lighting power density using a sample of lease agreement and a letter of commitment in lieu of lea

16
Thu Dec 20, 2018, 10:10 pm

Glazing required between 30" and 90"

CS-2009 IEQc8.2:Daylight and Views—Views
posted by  Ann Lubbers  on 

I am currently working on a project on which we are hoping to achieve the Views credit.  However, the low side of our glazing starts at 3'-0".  Does having solid wall between 30

1
Fri Dec 21, 2018, 2:28 pm

Common purchase orders

NC-2009 MRc4:Recycled Content
posted by  Alicia Freire  on 

Hi, I am currently working in two buildings which are identical, but which are being assessed under independent LEED assessments as they do not share project boundary.