Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Performance period timing

EBOM-2009 MRc9:Solid Waste Management—Facility Alterations and Additions
posted by  Kim Wajda  on 

If performance periods for different credits have to end within the same 30 day period, and our solid waste was hauled and tracked during the period of the project's additions and alterations, this

5
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Wed Apr 8, 2015, 2:58 pm

Building Facade lighting - ASHRAE Baseline values

NC-2009 EAp2:Minimum Energy Performance
posted by  Maya Karkour  on 

Dear All, I'm looking at Table 9.4.5 of ASHRAE 90.1-2007 which lists the maximum allowable LPDs for building exteriors.

5
Co-founder
Mimta EcoYapi
LEEDuser Basic Member
133 thumbs up
Wed Apr 8, 2015, 1:47 pm

Furniture Cost

CI-2009 MRc5:Regional Materials
posted by  Morteza Kasmaei  on 

In a LEED-CI project, can we attempt for MRc4, MRc5, and MRc7 but not included cost of furniture in the calculator? It means that the furniture is not included in any of the LEED-CI credits.

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Tue Apr 7, 2015, 11:19 pm

Semi-permanent streams

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Paula Hernandez  on 

Our project has a very small semi-permanent stream runing through it (i.e., the streams forms only in heavy rainfalls). .

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Tue Apr 7, 2015, 10:29 pm

documentation guidance updated

EBOM-2009 SSc2:Building Exterior and Hardscape Management Plan
posted by  Tristan Roberts  on 

LEEDuser has had a lot of comments from you that documenting this credit was confusing, particularly when environmental practices aren't employed 100% of our time.

5
Tue Apr 7, 2015, 4:20 pm

Energy modeling of an open roof stadium in a hot climate

NC-2009 EAp2:Minimum Energy Performance
posted by  Mario S.  on 

Good day, I have the following question regarding the energy modeling of a very large soccer stadium in a hot climate: My proposed design involves floor mounted and side mounted jet fans that are

3
Default Avatar
LEEDuser Basic Member
26 thumbs up
Mon Apr 6, 2015, 4:20 pm

SSpc14 Walkable project Site

Pilot-Credits PC14:Walkable Streets
posted by  Amanda Johnson  on 

I am trying to register for this Pilot Credit (which is not listed as closed) Both LEED Online and LEED User link to the USGBC Credit Library, but in the credit Library I find no link to register.

3
Fri Apr 3, 2015, 3:28 pm

Developement on EAp2?

General forums
posted by  Jean Marais  on 

Are there any plans to do the same sort of thing with EAp2?

2
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Fri Apr 3, 2015, 12:15 pm

Actual Material Cost vs. Material Cost: what's the difference?

NC-2009 MRc4:Recycled Content
posted by  Marcio Alberto Casado Pereira  on 

We received a review comment regarding credits MRc4 and MRc5 of a stadium we are working on in Brazil.

20
Default Avatar
Sustainability Consultant
Dagher Engineering
LEEDuser Basic Member
51 thumbs up
Fri Apr 3, 2015, 1:30 am

Categorizing a LEED project

LEED Rating System Selection
posted by  Adi Negara, LEED AP BD+C  on 

Hello all, I have a difficulty in determining the appropriate LEED rating system for a project, and I hope that you all can tell me what rating system is best suited to the project: The project ow

2
Thu Apr 2, 2015, 2:48 pm