furniture heights
CI-v4 EQc8:Quality viewsposted by emily reese moody on
I don't see anywhere in the reference guide...is there a specific height restriction for furniture (such as in an open office area) that items should be under in order to allow the space to count t
Can this be achieved with bus service only?
CS-v4 LTc5:Access to quality transitposted by Sara Mae Parker on
Does anyone know if this credit can be achieved with bus service alone?
Previously developed
CS-v4 LTc4:Surrounding density and diverse usesposted by Petra Hajná on
So the project site doesn't need to be previously developed any more to achieve the credit or do I miss some important interpretation?
Roof Water Feature
NC-v4 SSc5:Heat island reductionposted by Omer Moltay on
Dear All, My project is a museum building. The building roof is thick with water. So, project building roof have pool and observation terrace. Should it be counted as a reflective?
LEED Review - Simulation Worst-Case Not Accepted
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by GBD Architects on
I submitted a simulation output for our core and shell building.
Is this plant qualified as a DES?
NC-v4 EAp2:Minimum energy performanceposted by Aru Sau on
1. We registered the project as Campus consisting 3 Buildings. Central Plant Building and the future building is not included in the LEED boundary. 2.
EPD expiration date
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Harry Flamm on
Since EPDs have an expiration date, and though we may have specified a product while it is valid, it may get constructed in the building after it's expiration date.
FEV/LEV Signs
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Karl Heitman on
Does the sign have to be a post type? Could it be letters painted on the ground?
LEED CI v3 - Ofice - Energy Model. Please Advise
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by SSN Energy Model on
Hi, I am doing Energy Model for LEED CI Project under V3 2009 Rating System. The project is G+M+3 Floors. Our tenant spaces are located in 1st Floor.