EBOM-v4 SSc1:Site Development- protect or restore habitatposted by Simona Loberant on
We have a series of large planters featuring native plants and monarch butterfly attracting plants. Some of our planters are also used for growing food on-site.
Exhaust monitoring
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Ricardo Sá on
Do monitoring requirements also apply to spaces which only have exhaust requirements as per ASHRAE 62.1 - 2010 (e.g. toilets)? Thanks in advance!
new building on site with existing buildings - LEED boundary?
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Courtney Royal on
Our project is a new construction building and will be constructed on a site that already has 2 other structures.
APPA audits in Europe
EBOM-v4 EQp3:Green cleaning policyposted by Ana Villarroya on
I'm working on a green cleaning policy for a hospitality project.
Pilot credit: No Cooling Tower [ v4 - bc+d)
NC-v4 INc1:Innovationposted by Ydo Schuuring on
Hello, For a project no coolingtowers are used. There for we have the possibility to achieve the Pilot credit No Cooling Tower.
62MZ Calculator for v4
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Rasita Masalskyte on
The prerequisite form states that 62MZ Calculator can be used as an alternative to Minimum Air Quality Performance Calculator and it can found under the prerequisite's Resources tab in the Credit L
Thermal Comfort Controls
NC-v4 EQc5:Thermal comfortposted by LEED Pro Consultant on
We are working on a project mainly dedicated to showers (83) and changing rooms (20) of a very large complex, with no workspaces within it, Could the project comply with this credit by excluding th
Preproject water bodies
ND-Plan-v4 SLLp3:Wetlands and water body conservationposted by Sarah Kearney on
Hello, What does 'preproject' really mean? Our project is located near a river. Currently there is one building with docks within 50 ft. of the water.
Modeling Assumptions for Cold, Dark Shells
CS-v4 EAp2:Minimum energy performanceposted by Michelle Rosenberger on
Hi Marcus, For previous warehouse CS projects with little to no installed mechanical and electrical systems (typically freeze protection, a few ventilation fans, and exterior lighting) we have assu
Monitoring and Inspection of Irrigation System
EBOM-v4 SSc5:Site managementposted by RYAN BEN SABILALA on
For SS Credit Site Management, the performance requirement says: "Monitor irrigation systems manually or with automated systems AT LEAST EVERY TWO WEEKS during the operating season and correct any