Forum quick links
Measurement & Verification
CS-v4 EAc3:Advanced energy meteringposted by Ciaran McCabe on
Has the credit criteria for Base Build M&V been removed from V4 Core & Shell or has it been built into another credit ?
n/a
Healthcare-v2009 SSc9.1:Connection to the natural world - places of respiteposted by Ivy Lin on
As the reference guide says that every 200 sf respite area needs to provide 1 wheel chair seat,but the respite areas for staffs and patients+visitors should be separated.
n/a
Healthcare-v2009 SSc9.1:Connection to the natural world - places of respiteposted by Ivy Lin on
According to the requirement : "Open to fresh air, the sky and the natural elements, including seasonal weather ", does the outdoor terrace/roof without any greenery space but open to sky also coun
Boiler Thermal Efficiency (%)
CS-2009 EAc1:Optimize Energy Performanceposted by Ciaran McCabe on
Is there a formula for calculating the Boiler Thermal Efficiency using HHV. Should the modeled boiler efficiency be seasonal taking into account part load conditions.
LEED building uses Existing building's entrance
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Joyce Kelly on
A new, LEED warehouse addition is planned for an existing bldg.
Natural ventilation calculations
NC-2009 IEQp1:Minimum IAQ Performanceposted by Charalampos Giannikopoulos on
Before the excel spreadsheet introduction naturally ventilated spaces were referenced in the IEQp1 form. Where can those spaces be referenced in the spreadsheet? Thank you!
clay roof tiles - if acceptable under MRc6?
NC-2009 MRc6:Rapidly Renewable Materialsposted by Debra a. Lombard on
Are clay roof tiles (made in US) acceptable under MRc6? What about lime based plaster (made in US)? Thanks!
Innovative ideas
NC-2009 EAp2:Minimum Energy Performanceposted by sherif el adly on
Dear All, In my project I am trying to reduce energy consumption, I am using LED lights, high efficient air cooled units (baseline is water cooled chillers). The building already is underground bu
Acoustic Performance Calculator
NC-v4 EQc9:Acoustic performanceposted by Michelle Rosenberger on
I have a fully filled out acoustic performance calculator that is showing "No" compliance on Background noise that I believe is because of 2 empty rows in the table. I have enabled Macros.
SS9.1 area seating requirements
Healthcare-v2009 SSc9.1:Connection to the natural world - places of respiteposted by Ivy Lin on
When the respite area divided by 200sf and gets the result of decimal. Which round off should we do to the whole digit? Round down/up/to?