Forum quick links
LEED O+M: Multifamily
NC-v4 MPR3:Must comply with project size requirementsposted by Adam Stoker on
Where can I go to find information on the project size requirements for LEED O+M: Multifamily projects?
Option 2. Connectivity
ND-Plan-v4 SLLc1:Preferred locationsposted by Sarah Kearney on
I want to make sure I understand this correctly.
New Equipment with or without 0.5lb of Refrigerant
CI-2009 EAp3:Fundamental Refrigerant Managementposted by Michelle Rosenberger on
I have a project with a cafeteria that has a custom walk in cooler and a variety of refrigeration units.
Measuring through connection interval distance
ND-Plan-v4 NPDc6:Connected circulation networkposted by Ian Scott on
Where the project boundary is located on the project side of adjacent ROW is through connection distance measured between ROW centrelines at the project boundary or at the adjacent ROW centreline.
SFI vs FSC
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Leanne Conrad on
Does anyone know if GBCI will accept a Sustainable Forestry Initiative certified sourcing label instead of FSC?
shower requirement - total FTE vs peak FTE
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Erin Holdenried on
Has anybody used peak FTE (as opposed to total FTE) to calculate the required number of showers? And was it accepted by the GBCI reviewer?
Sustainable Purchasing: Durable Goods
NC-2009 IDc1:Innovation in Designposted by Joyce Kelly on
Working on a Warehouse with (4) vending machines, (2) refrigerators. With 24 hr. loads, these seem like good candidates for requring Energy Star qualified products.
Concrete as Temp barriers
NC-2009 MRc2:Construction Waste Managementposted by Ahmad Gabir on
Hi , We are working on Mega project is Saudi Arabia where we are using the concrete waste to build Safety road/excavation barriers which will be used on site during construction instead of purchasi
modeling with air cooled chiller
NC-2009 EAp2:Minimum Energy Performanceposted by sherif el adly on
the building size is mandating to model the baseline with a water cooled chiller and I will compare the baseline with the design which is using HVAC that is (air cooled chiller + ice storage + dive
Ice Machine
Schools-2009 WEc4:Process water use reductionposted by Laura Charlier on
The credit language reads max water use for over 175 lbs/day and max water use for under 175 lbs/day; I'm uncertain which criteria we are to follow. Our ice machine is over 175 lbs/day.