Tips for Implementation

Pilot-Credits EQpc78:Design for active occupants
posted by  Angela Wisely  on 

Pending our participation in this forum, we have met all the documentation requirements for this pilot credit, so I thought I would share some tips. 1) Potential Design Strategy: Our project is a

0

Awarded the credit?

NC-v4 EQc2:Low emitting materials
posted by  Heather Walters  on 

If you have submitted this credit please post if it was awarded or not. If you abandoned the credit at some point in the process when and why? Thanks.

1
Fri Aug 19, 2016, 2:55 pm

Is external verification always necessary?

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Vitor Tosetto   on 

Hi all! I have a doubt about EPD, could someone help me? This credit explains that products with LCA (ISO 14044) or EPD (ISO 14025) that have at least cradle-to-gate scope are valued as 1/4.

1
Tue Apr 5, 2016, 4:46 pm

Simulation. Warehouse. Fixed high racks, occupied.

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Candice Clark   on 

For a warehouse, can I deduct the permanently fixed high racking coverage area from the gross floor area, and focus my 75% daylight coverage on the aisles and landing spaces only? I say yes.

1
Thu Mar 31, 2016, 7:41 pm

Modeling a curtain wall

CS-2009 EAc1:Optimize Energy Performance
posted by  Ward Miller  on 

Theoretically one might think modeling the glazing and shadowbox portions of a curtain wall with a single assembly u-value would yield the same result as modeling the curtain wall as glazing for th

1
Sat Apr 2, 2016, 8:08 pm

Background Ventilation

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Patrice McVeigh  on 

Hi Everybody, ASHRAE 62.1 currently outlines a minimum ventilation rate for all room types, regularly occupied or not (i.e.

0

Bicycle Rack Distance

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Muge Karasahin  on 

Hello, I'm working on a CS Project larger than 300,000 square feet.

1
Fri Apr 1, 2016, 3:35 pm

Pre-Rinse Spray Valves in Laboratories

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Wyatt Suddarth  on 

I have several pre-rinse spray valves that were specified by an external laboratory consultant in a college laboratory building that do not appear to meet the requirement of being less than or equa

1
Wed May 18, 2016, 2:45 am

Green Roof Installation After PC for C&S

EBOM-2009 SSc7.2:Heat Island Reduction—Roof
posted by  Patrice McVeigh  on 

Hi, I have a Core & Shell Project that will be installing a Green Roof after the Post Construction stage (i.e.

1
Fri Apr 1, 2016, 7:26 pm

Industry benchmark comparison reports

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Omar Delgado  on 

Greetings, I'm trying to find a benchmark comparison report for manufacturing plants but have had no luck so far.

1
Fri Jun 17, 2016, 7:07 pm