Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Path 10

CI-2009 SSc1:Site Selection
posted by  Rodrigo Gomez Junco  on 

We are pursuing SSc1 Option 2 Path 10 for a CI project within a CS registered building. My question is, do I need the Tenant Lease Agreement from the CS project in order to document this credit?

1
Tue Jan 12, 2016, 3:42 pm

LEED 2009 IEQc6.2 Thermal Comfort LEED Letter Template

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Greg Snow  on 

Hi Everyone, I was searching the toolkit to find samples of the LEED Letter Template for this Credit bu I couldn't .

0

Maximum number of ID points allowed

CI-2009 IDc1:Innovation in Design
posted by  javier torres  on 

Hi there, I'm working on LEED NCv2009 project and trying to find out if there is a limit as to how many points can be earned in the ID category. The LEED checklist shows up to 6 points (1.1 thru 1.

1
Tue Sep 15, 2015, 10:30 pm

EBOM SSc2: policy vs practice for snow removal

EBOM-2009 SSc2:Building Exterior and Hardscape Management Plan
posted by  Drew DePalma  on 

Hi, I have read in this forum that if no deicer is applied during a performance period that a project would be in compliance with that element of the SSc2 credit requirements.

1
Fri Oct 9, 2015, 10:07 pm

Changes during Design Review

NC-2009 EAp2:Minimum Energy Performance
posted by  Victoria Watson  on 

Hi, We are currently responding to LEED Reviewer comments for a building.

1
Tue Sep 15, 2015, 7:29 pm

Garage Lighting LPDs

NC-2009 EAp2:Minimum Energy Performance
posted by  Joseph Snider  on 

ASHRAE lists .2 w/sf for garage spaces in Space by Space, and .3 w/sf in Building Area method.

1
Tue Sep 15, 2015, 10:02 pm

What if landscaping isn't installed yet?

EBOM-2009 WEc3:Water Efficient Landscaping
posted by  Vanessa Seibert  on 

We are in the PP but do not have our low-water landscaping installed. A contract will be signed to install it prior to the end of the PP. Has anyone obtained the credit this way?

1
Thu Sep 24, 2015, 5:23 pm

Innovation in Design Path 1 & Exemplary Performance Path 2

CS-2009 IDc1:Innovation in Design
posted by  Maggie Hogan Skaug  on 

1) It is my understanding that a project may pursue BOTH Path 1 and Path 2 to attempt up to 5 credits in this category.

1
Wed Sep 16, 2015, 4:32 pm

Option B Calculator

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Haley Duncan  on 

Where can I find the Option B Calculator that is used to calculate compliance with 10 CFM per person for AHU's unable to meet ASHRAE 62.1-2007?

1
Mon Jan 25, 2016, 10:59 pm

School Expansion with Multiple Blocks

LEED Rating System Selection
posted by  Philippa Cameron  on 

Hi, We have a school expansion project to introduce a new middle school on a site which already has an existing primary and secondary school present.

1
Fri Nov 27, 2015, 2:36 pm