Treatment of shared chiller plant
posted by Scott McMillan on
We have a central chiller plant generating chilled water to serve a hotel and a convention centre. Only the convention centre will be seeking LEED certification under LEED NC 2009.
Submission through design review
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by Charalampos Giannikopoulos on
Does the tenant design & construction guidelines (which is considered as a design credit) need to be finalized for review submission?
Option 2 IAQ Testing - Schedule
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Anne-Claire BARBERI on
Hello, In the reference guide, it is written that for "Option 2 Air Testing", the test must be conducted after construction ends and within 14 days following occupancy.
Contact at USGBC regarding LEED ND
ND-Plan-v4 MPR3:Must comply with project size requirementsposted by Martine Desbois on
I am looking for a contact at USGBC to discuss our project. Would it be possible to have a contact person name and email or phone number?
Protect Habitat on Campus
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Marissa Hebert on
Our project is a large medical campus with multiple buildings on a greenfield site.
How to calculate Floor Area to be Ventilated?
NC-v4 EQp1:Minimum indoor air quality performanceposted by Vitor Tosetto on
Dear, I have one more question, please. In ASHRAE 62.1-2010 section 6.4.1 there is an explantion about floor area to be ventilated.
IAQ calculator occupancy designations?
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Patricia Andrasik on
I'm working on a dormitory that features 4-bedroom suites that are occupied by 5 people (3 single rooms and one double per suite as well as a living room, shower room, sink/vanity area, and toilet)
Home size credit calculation
Homes-v4 EAp4:Home sizeposted by Jean Henderson on
Developing 130 unit condo project. 24 are 2 bdr (average size 36% below ES ref home). Rest are 1bdr (average size 24% below ES ref home).
Submission of Design Cr. during Constr. Final Rev. f. 2nd round
posted by Lise Dannesboe on
Hi! Split-Review project: We submitted a Design credit for Design Prelim Review and for the Final Design Review, I would like to put this credit on hold and first submit for a second round of revie
Space usage type - kitchen
CS-2009 PIf3:Occupant and Usage Dataposted by Thomas Baltsersen on
We got a comment back from preliminery review regarding kitchen in an office building. We defined these Spaces as retail general which apparently was incorrect.