Treatment of shared chiller plant

General forums
posted by  Scott McMillan  on 

We have a central chiller plant generating chilled water to serve a hotel and a convention centre. Only the convention centre will be seeking LEED certification under LEED NC 2009.

1
Thu Jun 25, 2015, 1:47 pm

Submission through design review

CS-2009 SSc9:Tenant Design and Construction Guidelines
posted by  Charalampos Giannikopoulos  on 

Does the tenant design & construction guidelines (which is considered as a design credit) need to be finalized for review submission?

1
Mon Nov 30, 2015, 5:19 pm

Option 2 IAQ Testing - Schedule

CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Anne-Claire BARBERI  on 

Hello, In the reference guide, it is written that for "Option 2 Air Testing", the test must be conducted after construction ends and within 14 days following occupancy.

1
Fri Jun 24, 2016, 9:52 am

Contact at USGBC regarding LEED ND

ND-Plan-v4 MPR3:Must comply with project size requirements
posted by  Martine Desbois  on 

I am looking for a contact at USGBC to discuss our project. Would it be possible to have a contact person name and email or phone number?

1
Fri Jun 26, 2015, 3:30 pm

Protect Habitat on Campus

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Marissa Hebert  on 

Our project is a large medical campus with multiple buildings on a greenfield site.

1
Thu Jul 2, 2015, 7:04 pm

How to calculate Floor Area to be Ventilated?

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Vitor Tosetto   on 

Dear, I have one more question, please. In ASHRAE 62.1-2010 section 6.4.1 there is an explantion about floor area to be ventilated.

1
Thu Dec 15, 2016, 9:47 pm

IAQ calculator occupancy designations?

EBOM-v4 EQp1:Minimum indoor air quality performance
posted by  Patricia Andrasik  on 

I'm working on a dormitory that features 4-bedroom suites that are occupied by 5 people (3 single rooms and one double per suite as well as a living room, shower room, sink/vanity area, and toilet)

1
Thu Aug 18, 2016, 6:30 pm

Home size credit calculation

Homes-v4 EAp4:Home size
posted by  Jean Henderson  on 

Developing 130 unit condo project. 24 are 2 bdr (average size 36% below ES ref home). Rest are 1bdr (average size 24% below ES ref home).

1
Fri Jul 10, 2015, 5:25 pm

Submission of Design Cr. during Constr. Final Rev. f. 2nd round

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Lise Dannesboe  on 

Hi! Split-Review project: We submitted a Design credit for Design Prelim Review and for the Final Design Review, I would like to put this credit on hold and first submit for a second round of revie

0

Space usage type - kitchen

CS-2009 PIf3:Occupant and Usage Data
posted by  Thomas Baltsersen  on 

We got a comment back from preliminery review regarding kitchen in an office building. We defined these Spaces as retail general which apparently was incorrect.