Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

initial fit-out vs alteration?

Retail-CI-v2009 PIf2:Project Summary Details
posted by  Andrew Bennett  on 

What is the difference between initial fit-out and alteration square footages?

0

90% controls for open office systems furniture

CI-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Brian VanAllen  on 

As the electrical design engineer; what is an acceptable means for me to meet the 90% controllability requirement on my drawings- for open offices?

0

Storm dry pond onsite overflows to stormceptor

LEED Canada Forum
posted by  Marie-France Duthilleul  on 

Pre condition - open field and grass, a few trees. Post Condition: Development of a large military type vechicle building with loading docks and paved circulation drive area.

0

Campus Registration instead of Block?

LEED Guidance for Campuses and Multiple Buildings
posted by  Deborah Lucking  on 

Hello all. I notice on LEED Online that there is now an option to register a new project under "Campus" but not under "Block", which USED to be the way to start the registration process for multipl

1
Wed May 27, 2015, 5:05 pm

IEQp1

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Gordon Nielson  on 

I am having troubles understanding what is a single zone system and a multiple-zone system and how to fill out the forms.

1
Wed May 27, 2015, 8:14 pm

Rating System Path

ND-v4 MPR2:Must use reasonable LEED boundaries
posted by  Philippa Cameron  on 

Hi, Can you please help me confirm how we verify LEED ND: Built Project as the suitable rating system path to follow, and set the boundary to accommodate this? The guidance states that: a.

1
Thu May 28, 2015, 6:37 pm

Off-site area counted for two LEED projects

EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitat
posted by  Anna Korinkova  on 

There are two buildings to be certified, the same Owner, located on the same campus.

1
Tue Jun 2, 2015, 7:16 pm

How to deal with a multi-use college residence hall

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Mike Stopka  on 

I am working on a rather unique residence hall building that has a variety of uses. I am trying to determine what spaces need bike storage and shower/changing facilities.

1
Mon Jun 1, 2015, 10:18 am

IEQp1 ventilation cals

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Gordon Nielson  on 

I am calculating the ventilation requirements for a conference room. From the ASHRAE Table 6-1 I selected .06 cfm/ft2 and 5 cfm/person. The room has occupancy of 8 people.

1
Fri May 29, 2015, 4:37 pm

1 year contract?

NC-2009 EAc6:Green power
posted by  Erin Holdenried  on 

In v2.2 is was acceptable to have a 1 yr contract as long as the total green power purchased was equivalent to 2 years of 35% electricity, or year of 70% electricity for exemplary performance.

1
Fri May 29, 2015, 6:34 pm