Forum quick links
Renovation project and LEED certification of the addition only
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by John Smith on
Quick question please: I have an existing building of 1000 sq ft. 700 sq ft of them are to be renovated, the remaining area is to left intact. There will also be a brand-new addition of 500 sq ft
Nature Trail
Healthcare-v2009 SSc9.1:Connection to the natural world - places of respiteposted by Marissa Hebert on
If you use a universal access nature trail as part of your Places of Respite, does the trail have to provide shaded seating?
Simulation approach strategy.
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by TOMAS URIBE on
Hello Marcus. We have a project that will be applying for LEED certification under CI. The project is located on 4th floor within an office building with 5-floors.
Minimum occupancy requirements for projects pursuing LEED NC
posted by Guillermo Hernandez Espinoza on
Hi. The project is registered under LEED BD+C: New Construction v2009. Is there any Addenda that perhaps changed what is required for a project pursuing LEED NCv2009 from 50% to 0%? (For such a
ASHRAE 90.1-2007 - 6.4.3.1.1 COMPLIANCE CRITERIA
CI-2009 EAp2:Minimum Energy Performanceposted by RICARDO HERNANDEZ on
Does anyone know how stringent is the criteria to achieve compliance with the 6.4.3.1.1 Zone Thermostatic Controls for a Commercial Interiors?
Redrawing Project Boundary AFTER Initial Review
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by C.M. G. on
Hello, We are currently preparing our project for final review, and realized that that we drew our project boundary in such a way that disqualifies us from SSc8.
Where are the Import Facility Data Templates?
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Lewis Hewton on
Can somebody please direct me where to find the 'import facility data' templates on the Energy Star website?
Does new LEED online open now?
posted by Jorng-ren Chern on
It is Dec. 13 now and I still cannot find the webpage of LEED online V4. Can anyone provide the link? Thanks.
Utility tariff - an accepted DR strategy?
Data-Centers-NC-v4 EAc4:Demand responseposted by H.K.C.B. Heendeniya on
Hi, Our electricity tariff for industries has a time based component and peak demand (kVA) component.
Naturally Ventilated Underbuilding Parking Garage and 62.1
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
62.1 has an exahust requirement for mechanically ventilated Parking garages (Table 6-4), with an exception C - no ventilation required if two or more sides comprise walls that are at least 50% open