Log in
Forum » CS-v4 EQc1
Loading...
Topic

Option 2 A Exterrior contamination prevention- software

CS-v4 EQc1: Enhanced indoor air quality strategies
posted by Przemysław Rejczak on Nov 13, 2019, 8:35 am

Dear everyone,

Could you please inform which is the most reasonable software to prepare CFD analysis to show Exterrior Contamination Prevention compliance?

There are no strict...

Last reply: Mohammad H Abbasi, Nov 22, 2019, 10:03 pm

CS requirements for office space

CS-v4 EQc1: Enhanced indoor air quality strategies
posted by Timothy Ian Middleton on Nov 13, 2019, 3:38 am

We have an office building project. Circulation, F&B and reception areas have high enough...

Entryways systems in Retails places out the LEED certification

CS-v4 EQc1: Enhanced indoor air quality strategies
posted by Mauricio Ramirez on Oct 21, 2019, 12:33 pm

Hello Dear I´m writing you because i have a doubt about the entryways systems in my project C&S v4. We are working in a offices project and the project has in groundfloor and the second level...

Tenant lease agreement

CS-v4 EQc1: Enhanced indoor air quality strategies
posted by Ricardo Sá on May 16, 2019, 4:39 am

Dear All,

One of our clients is in the final phase of the certification process of an office building but some of the tenant spaces are not yet rented (i.e., future tenant not yet...

Last reply: Mohammad H Abbasi, May 16, 2019, 10:30 am

entrance to a roof terrace

CS-v4 EQc1: Enhanced indoor air quality strategies
posted by Agata Mozer on Jun 12, 2018, 6:01 am

I would like to ask if an entrance to a roof terrace is considered a...

Last reply: Dustin Norton, Nov 19, 2018, 5:25 pm

Specs for approved roll out mat that is less than 10'-0" in length

CS-v4 EQc1: Enhanced indoor air quality strategies
posted by Victor Caban-Diaz on Jun 28, 2018, 11:35 am

Does anybody have specs for an approved roll out mat that is less than 10'-0" in length that can be used for this credit?

CO2 monitoring for Core and Shell projects

CS-v4 EQc1: Enhanced indoor air quality strategies
posted by Irene Chung on Apr 9, 2017, 5:56 pm

Hi,

Is a copy of the lease agreement stating that tenants must install co2 sensors in all densely occupied spaces required for v4 Core and Shell projects?

If not, can the project...

Last reply: Martha Hernández, Jun 13, 2018, 1:12 pm

entry way and air filtration

CS-v4 EQc1: Enhanced indoor air quality strategies
posted by MARIA ESTHER LAMADRID on Apr 11, 2018, 1:08 pm

Can entry way systems be located in the exterior but under canopy?

Does it exist an exception for very small hvac equipments that can't have air filtration Media of 11 or 13, it only...

No MERV 13 in minor occupancy area

CS-v4 EQc1: Enhanced indoor air quality strategies
posted by sompoche sirichote on Feb 21, 2018, 5:48 am

Hi,

Our project is a high-rise office tower with a small podium in front of the project. Our office tower has 55 storey. The podium is open air space where has small enclosed retail and...

Entryway System in TSLA

CS-v4 EQc1: Enhanced indoor air quality strategies
posted by Leilanie Bruce on Aug 23, 2017, 1:56 pm

My CS v4 project wants to pursue Enhanced...

Last reply: Tristan Roberts, Aug 26, 2017, 1:42 pm