Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

On Site Renewable energy double dip

NC-2009 EAc6:Green power
posted by  Todd Bundren  on 

My client is producing enough energy on-site (solar) to get all the points in EAc1 and EAc2 with a large surplus of renewable energy.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed May 29, 2013, 3:43 pm

Re: Review Comments with Phantom Requirements

General forums
posted by  David Posada  on 

Michelle - see the reply to your post at EQp2: https://www.leeduser.com/credit/NC-v2.2/EQp2#comment-22021

16
Director of LEED Support
U.S. Green Building Council
LEEDuser Premium Member
25 thumbs up
Wed May 29, 2013, 2:21 pm

Meaning of "Ready to Use Products"

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Abdulrahman Sherazy  on 

Hello Colleagues, I have an epoxy coating for flooring with VOC content

3
Wed May 29, 2013, 2:19 pm

Radiant Floor Heating with Natural Ventilation

NC-2009 EAp2:Minimum Energy Performance
posted by  Jean Marais  on 

Hi Group, I have a project with only Radiant Floor Heating with Natural Ventilation. I have modeled both baseline and proposed with the baseline HVAC for cooling (the missing system).

3
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Wed May 29, 2013, 8:30 am

identify preferential sites

CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  gabriel Morales  on 

Our project developed, we have an underground parking garage, where 100% of the places will be operated by robotic systems. How do we identify preferential sites for LEED credits? regards,

5
Tue May 28, 2013, 10:09 pm

Single building or multiple buildings?

LEED Guidance for Campuses and Multiple Buildings
posted by  Aditi Padki  on 

We are working on a manufacturing plant outside United States.

4
Default Avatar
Sustainability Architect
LEEDuser Basic Member
88 thumbs up
Tue May 28, 2013, 9:41 pm

Design Outdoor Air Intake much larger than required

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Diana Hill  on 

Hello, we are doing our office project on a tenth floor of an office building. We have two fan coil units which supply outdoor air to the office.

2
Default Avatar
Project Manager
EAN Technology
LEEDuser Basic Member
17 thumbs up
Tue May 28, 2013, 4:59 pm

Table PIf3-3 Total Daily Occupancy

General forums
posted by  Dale Dunnet  on 

I have read several questions/ replies in the forum, but am still unclear. Some background: We have a 70k warehouse attached to a 20k office. The entire facility has 12 FTEs.

6
Sustainability Manager and Architect
Pope Design Group
LEEDuser Basic Member
47 thumbs up
Tue May 28, 2013, 3:25 pm

Revise of load input in Proposed case prior to Appeal

CS-2009 EAp2:Minimum Energy Performance
posted by  Therese Malm  on 

Hi, Our project has received a denial for EAp2 and we intend to appeal.

3
Default Avatar
Min engineering inc
LEEDuser Basic Member
2 thumbs up
Tue May 28, 2013, 3:15 pm

Revise of input load prior to Appeal

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Therese Malm  on 

Hi, I have posted the same topic under EAp2 for C&S v.2009 but I guess it is more relevant to post it here. Hi, Our project has received a denial for EAp2 and we intend to appeal.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue May 28, 2013, 2:22 pm