Circulation space around the building core
CS-v4 EQc4:Daylightposted by Julien Richard on
For Core&Shell projects, the reference guide specifies : “Assume that the entire floor plate, except for the core, will be regularly occupied space “.
FTE calculation and use associated for visitors
Healthcare-v2009 WEp1:Water use reductionposted by Annabelle Lam on
I am working on a hospital project where I have both inpatients and visitors.
LEED Online Form Help for Process Water
Retail-CI-v2009 WEp1:Water use reductionposted by Sara Zoumbaris on
Hello, I have a project with three pieces of process water equipment and I have a few questions about the form. 1.
WE Credit 4.2: Cooling Tower Water Management- non potable
EBOM-2009 WEc4:Cooling Tower Water Managementposted by satheesh M on
The project’s cooling requirement is being met by both chiller plant inside the project boundary as well as the chiller plant in the Building Owned DES.
Exempt area of 10% in a Group Project
posted by Gabriel Frasson on
We have a site that contains two buildings that are being certificate as a campus project. In the ground floor of Tower A there are some stores that we want to exempt of the certification project (
Regularly Occupied Space Area Calculation
NC-2009 PIf3:Occupant and Usage Dataposted by ESRA OZKONUKSEVER on
Dear All, While calculating the squarefootage of the regularly occupied spaces in a project building, do we use the gross or the net area of the spaces? Thank you!
Previous coal mine area
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Agnieszka Rylska on
Is a site which is located on a teritory of a previous coal mine considered perviously developed?
The three dimensional orientation of the luminaire
Pilot-Credits SSpc7:Light pollution reductionposted by Aly Rawji on
Can you please provide a sample for this, what is required for "The three dimensional orientation of the luminaire (plan/ elevation)"?
Green Power - Carbon Offset
CI-2009 EAc4:Green Powerposted by Henry Mak on
Hi All, I am working on a project located in China.The owner is the local electric company who has solar power and wind power supply.
right of ways adjacent to project?
ND-Plan-v4 NPDc7:Transit facilitiesposted by Ian Scott on
Given how a project boundary is supposed to be defined, either the project side of the right of way or the far side (non-project side) of the right-of-way, for this credit how do you deal with tran