Recycling Building ProductsCS-v4 MRc5: Construction and demolition waste managementposted by Ciaran McCabe on Oct 7, 2019, 5:07 pm
Hi, if existing building materials, such as concrete as an example, is removed from site during demolition, is there benefits if this was processed offsite and reused in there of gravel for the... Last reply: Catarina Costa Goncalves, Apr 23, 2024, 11:47 am |
|
LEED v4 Waste Monitoring unit of measurement in Truck LoadCS-v4 MRc5: Construction and demolition waste managementposted by Ronnel Flores on Mar 11, 2020, 8:41 pm
Our project's waste quantity was recorded in truck load not in kilograms. This counts as volume? Shall we determine just an average volume for one truck load in any of the units in the calculator... Last reply: Chris Leoni, Jul 20, 2023, 11:19 am |
|
On site or Off site seperationCS-v4 MRc5: Construction and demolition waste managementposted by Andrea Tirao on Nov 10, 2022, 7:59 am
Our project has extensive generation of wastes into different activity zones. For this reason, the Contractor's strategy is to bring the wastes directly off-site comingled and the waste hauler... |
|
Recycling rate of construction and demolition wasteCS-v4 MRc5: Construction and demolition waste managementposted by Tiago Rigobello on Nov 4, 2022, 5:08 pm
How can we prove the recycling rate of construction and demolition waste made by the recycler? What are the options in Brazil? Thanks! Best regards! |
|
Comingled waste on site- separation at waste facilityCS-v4 MRc5: Construction and demolition waste managementposted by Alicia Ravetto on Nov 29, 2018, 1:14 pm
Is this always considered a single stream? What method of documentation should the waste facility provide to comply with the requirement of this credit? Last reply: Richard Metts, Oct 3, 2019, 5:31 pm |
|
Volume to Weight Conversion for LEED v4CS-v4 MRc5: Construction and demolition waste managementposted by Estra Marku on Jul 17, 2019, 5:40 pm
LEED v2009 allowed us to use the volume to weight conversion methodology to track our projects waste. I was wondering if the same methodology can be used in LEED v4 or do the units for all... Last reply: Richard Metts, Jul 18, 2019, 3:22 pm |
|
Construction Waste Management Core and Shell and Tenant Upfit SpacesCS-v4 MRc5: Construction and demolition waste managementposted by Summer Minchew on Feb 22, 2019, 2:15 pm
Can a Core and Shell project include tenant construction debris in overall... Last reply: Tiffany Beffel, Feb 26, 2019, 1:22 am |
|
Brick and rubble in soilCS-v4 MRc5: Construction and demolition waste managementposted by Marilyn Specht on Mar 9, 2018, 11:25 amWe got a response from GBCI on this and here is what they said: "the soil and bricks should be excluded from the waste management calculations. As mentioned in the credit requirements, 'exclude excavated soil, land-clearing debris from calculations.'" Log in or register to post comments 0 Vote up! Thanks for posting GBCI's response on both forums. Log in or register to post comments 1 Vote up! ... Last reply: RETIRED, Mar 12, 2018, 1:59 pm |