Topic

PV Lease Agreement Clarification

NC-v4 EAc5: Renewable energy production
posted by Jeff Ross-Bain, PE, LEED Fellow on Aug 14, 2019, 1:07 pm

Our project intends to provide land, under a min. 10-year lease, to the local power provider who will install a min. 1MW PV system. The power provider will own the PV system and the Owner has the...

Last reply: Marcus Sheffer, Aug 15, 2019, 2:46 pm

Existing PV on previously certified project

NC-v4 EAc5: Renewable energy production
posted by Yu Zhang on Feb 13, 2019, 3:33 pm

I have a project that is a new building located on a previous certified LEED project with PV production.  The previous project had >90% offset by energy use and >100% offset by cost from...

Last reply: Marcus Sheffer, Jul 23, 2019, 2:44 pm

Alternative requirements for buildings with high non-regulated loads

NC-v4 EAc5: Renewable energy production
posted by Tim Middleton on May 22, 2018, 5:51 am

We are working on a Manufacturing Project in Vietnam with very high non-regulated loads (around 75% of the total energy consumption). For LEED v2009 there is a...

Last reply: Candice Rogers, May 30, 2019, 4:07 pm

Solar energy production

NC-v4 EAc5: Renewable energy production
posted by Nithya Madan on Jan 16, 2018, 3:28 pm

Scenario 1 - Is solar energy produced inside the campus but outside of the project boundary considered towards the credit?

Scenario 2 - If yes to 1 , could this be considered for...

Last reply: Marcus Sheffer, Feb 14, 2019, 12:07 pm

Timing of Installation and Commissioning

NC-v4 EAc5: Renewable energy production
posted by Michaella Wittmann on Jan 29, 2018, 11:22 am

The LEED Credit template for this credit indicates that the renewable installation has to be complete and commissioned prior to building occupancy. Are any exceptions made to this if the...

Last reply: Deborah Lucking, Jan 16, 2019, 11:51 am

use of waste heat from iIndustrial process for the office heating

NC-v4 EAc5: Renewable energy production
posted by Qian Tang on Jul 10, 2018, 6:22 am

them in the EAp2 forum since this is not a question regarding renewable energy. The question is how to account for the cost issue. If the proposed heating fuel cost is free then what is the baseline fuel...

Last reply: Marcus Sheffer, Aug 10, 2018, 12:35 pm

Regarding Solar PV System Selection

NC-v4 EAc5: Renewable energy production
posted by Mamun Ferdaus on Jul 10, 2018, 10:19 am

 Hi,
This is Mamun. We are having some problems with selecting Solar PV System. Is there any standard/baseline for selecting solar panel efficiency and inverter efficiency for LEED Project...

Last reply: Marcus Sheffer, Jul 10, 2018, 11:51 am

Using a different Energy Consumption in EAc2 to EAc5 to reflect actual conditions

NC-v4 EAc5: Renewable energy production
posted by Tim Middleton on May 29, 2018, 3:10 am

We are working on a Manufacturing Project in Vietnam with very high non-regulated loads (around 75% of the total energy consumption). It is designed without air conditioning, mechanical...

Last reply: Tim Middleton, Jun 5, 2018, 3:06 am

Wind-PPA as renewable energy production?

NC-v4 EAc5: Renewable energy production
posted by Lai-San wong on Jun 13, 2017, 5:19 am

Hi!
In the requirement for EAc5 (BD+C) it is stated:
"The use of solar gardens or community...

Last reply: Marcus Sheffer, Feb 13, 2018, 11:29 am

RE split between on site production and lease agreement

NC-v4 EAc5: Renewable energy production
posted by Jason Garvens on Jan 18, 2018, 10:59 am

Can a project split the source of...

Last reply: Gail Hampsmire, Feb 12, 2018, 4:47 pm