Tenants using energy supplier metersCS-v4 EAc3: Advanced Energy Meteringposted by Ricardo Sá on Jun 18, 2020, 4:07 am
Dear All, We are currently certifying a large office building using LEED v4 BD+C Core & Shell. The... Last reply: Marcus Sheffer, Jun 18, 2020, 12:15 pm |
|
Alternative methods of documenting an executed tenant lease agreement?CS-v4 EAc3: Advanced Energy Meteringposted by Allan Robles on Sep 10, 2019, 2:45 pm
Hi there LEEDuser-verse, Has there been anyone who has documented the installation of future tenant metering via a tenant lease agreement or an email acknowledgment between the owner and... |
|
Subtraction metering in C&SCS-v4 EAc3: Advanced Energy Meteringposted by HoMU WELLTECH on Jan 9, 2019, 8:01 am
Good morning, Would like to clarify if subtraction metering may be used in Core & Shell for the... Last reply: Marcus Sheffer, Jan 11, 2019, 4:21 pm |
|
Advanced Energy Metering for each tenant spaces?CS-v4 EAc3: Advanced Energy Meteringposted by Yoyo Shek on Dec 12, 2018, 2:10 am
Hi All, I would like to clarify if every tenant spaces owned by different tenants requires individual set of advanced meters? For example, assume there are 20 retails shops (owned... Last reply: Marcus Sheffer, Dec 13, 2018, 9:41 am |
|
Chilled water from on-site electric chiller plantCS-v4 EAc3: Advanced Energy Meteringposted by Nuttanee Vongveeranonchai on Jun 4, 2018, 9:16 am
Hi all, If a core and shell building has an electric chiller plant supplying chilled water to all tenant floors’ AHUs, is the chilled water considered as another type of energy source and... Last reply: Marcus Sheffer, Jun 4, 2018, 4:12 pm |
|
advanced metering versus metersCS-v4 EAc3: Advanced Energy Meteringposted by Jens Apel on Jul 19, 2017, 2:57 am
I am somewhat confused comparing the requirements of C&S and New Construction. In C&S requirements there is no statement about 10% of energy end use; to me that means advanced meters only... Last reply: Jens Apel, May 14, 2018, 2:12 am |
|
1 point for CS-v4 EAc3- Advanced energy metering?CS-v4 EAc3: Advanced Energy Meteringposted by Joanne Sawatzky on May 11, 2018, 6:17 pm
I assume C&S can achieve 1 point with this credit but the Reference Guide doesn't explicitly say 1 point. "This credit applies to: New Construction (1 point), Core and Shell,... Last reply: Tim Nabholz, May 11, 2018, 8:35 pm |
|
Number of meters in C&SCS-v4 EAc3: Advanced Energy Meteringposted by Diego Prada on Apr 19, 2018, 12:13 pm
In the credit language for Core & Shell is stated that a sufficient number of meters should be provided to capture total tenant energy use with a minimum of one meter per energy source per... Last reply: Marcus Sheffer, Apr 19, 2018, 12:47 pm |
|
Condenser waterCS-v4 EAc3: Advanced Energy Meteringposted by MKK LEED on May 1, 2017, 3:08 pm
Hi, Last reply: Marcus Sheffer, Aug 28, 2017, 9:45 am |
|
Measurement & VerificationCS-v4 EAc3: Advanced Energy Meteringposted by Ciaran McCabe on Jan 7, 2017, 10:09 am
Has the credit criteria for Base Build M&V been removed from V4 Core & Shell or has it been built into another credit ? Last reply: Marcus Sheffer, Jan 7, 2017, 2:12 pm |