Topic | Recent |
---|---|
Baseline Heat Rejection System 7CS-v4 EAc2: Optimize Energy Performanceposted by Ciaran McCabe on Jul 19, 2018, 6:24 am
Hi I am using Baseline system 7 and I notice that the heat rejection energy is higher than expected. ASHRAE 90.1 2010 SI edition states "The heat rejection device shall be an axial fan... Last reply: Marcus Sheffer, Jul 20, 2018, 4:05 pm |
|
ASHRAE 90.1-2010 Baseline Fan Power CalculatorCS-v4 EAc2: Optimize Energy Performanceposted by Ciaran McCabe on Mar 27, 2018, 5:37 am
Hi, As anyone got a Baseline Fan Power Calculator for ASHRAE 90.1 2010 like what was available for 90.1 - 2007 created by the 7 group ? Last reply: Ciaran McCabe, Apr 4, 2018, 10:28 am |
|
IT Server RoomsCS-v4 EAc2: Optimize Energy Performanceposted by Ciaran McCabe on Mar 16, 2018, 12:18 pm
Hi, Is there any specific guidance on how IT server rooms in Office buildings should be modeled in the Proposed and Baseline building in terms of the air -conditioning units installed to... Last reply: Marcus Sheffer, Mar 16, 2018, 1:00 pm |
|
Commercial refrigeration savings (process energy)CS-v4 EAc2: Optimize Energy Performanceposted by Ricardo Sá on Mar 14, 2018, 6:35 am
Hi, we're working on a project that is pursuing LEED C&S certification. This project includes mainly a hypermarket and some small shops, mall areas and car parks. In what relates to... Last reply: Marcus Sheffer, Mar 15, 2018, 9:04 am |
|
Signed Tenant Lease AgreementCS-v4 EAc2: Optimize Energy Performanceposted by Ciaran McCabe on Jan 9, 2018, 5:44 pm
The LEED Reference Guide states "If a project team wishes to pursue additional credits or thresholds beyond the construction scope of the LEED project, a binding tenant sales and lease agreement... Last reply: Marcus Sheffer, Jan 25, 2018, 11:14 am |
|
Vertically Attached ProjectCS-v4 EAc2: Optimize Energy Performanceposted by LEED Pro Consultant on Apr 18, 2017, 2:21 pm
Our team is working on a project which follows a vertically attached approach. A C&S building is sitting on top of a retail building, each with separate entrance, energy metering, management... Last reply: Marcus Sheffer, Apr 18, 2017, 3:10 pm |
|
Advanced Energy Modeling Guide for LEED Technical ManualCS-v4 EAc2: Optimize Energy Performanceposted by Ciaran McCabe on Jan 5, 2017, 5:18 am
Does anyone know if there will be an Advanced Modeling Guide for Version 4 and when it might be released. Last reply: Marcus Sheffer, Jan 5, 2017, 9:56 am |
|
DES systemsCS-v4 EAc2: Optimize Energy Performanceposted by Mike D on Aug 7, 2014, 4:16 am
If the building is connected to a... Last reply: Marcus Sheffer, Apr 14, 2015, 10:06 am |