Has LEED provided any incentive for electrifying buildings in areas with clean electrical grids?NC-v4 EAc2: Optimize Energy Performanceposted by Tim Nabholz on Sep 22, 2021, 6:56 am
Hi Marcus, I have posted this in the v4.1 credit as well, but understand this one is much more active. I am working on a LEED v4 project looking at following EApc95 for Energy. I... |
|
CalculatorNC-v4 EAc2: Optimize Energy Performanceposted by Flavien Darthout on Jul 16, 2021, 4:48 am
Hi, I'm a beginner with the LEED v4 and the calculator for the EAc2 credit. I'm asked about the interest of the calculator. We put the simulation results in it so what is it used... Last reply: Marcus Sheffer, Jul 26, 2021, 11:24 am |
|
ASHRAE 90.1-2016 and v4NC-v4 EAc2: Optimize Energy Performanceposted by Mark Meaders on Apr 21, 2021, 4:34 pm
Has anyone used ASHRAE 90.1-2016 as a baseline for a v4 project and know what the adjustment in points would be for this baseline? I know USGBC made adjustments for a 90.1-2013 baseline, but I... Last reply: Michelle Christopher, Apr 23, 2021, 1:38 pm |
|
Single-zone System (exception 'b' to G3.1.1) dealing withNC-v4 EAc2: Optimize Energy Performanceposted by Ale g on Mar 2, 2021, 8:24 am
How do you deal with exception (b) to G3.1.1? Do you apply a single-zone system (1) to spaces that have a COOLING or HEATING PEAK LOADS that differ more than 31.2 W/m2 to other spaces... Last reply: Ale g, Mar 8, 2021, 12:42 pm |
|
Documentation of Efficiency Measures/ AnalysisNC-v4 EAc2: Optimize Energy Performanceposted by Michelle Christopher on Dec 3, 2020, 4:31 pm
For a few v4 projects I have twice now recieved comments during review that say the following: "1. It is not clear if the project analyzed efficiency measures during the design process and... Last reply: Marcus Sheffer, Dec 16, 2020, 3:32 pm |
|
SemiheatedNC-v4 EAc2: Optimize Energy Performanceposted by Sarah Leenknegt on Apr 15, 2019, 9:55 am
Hi I have not yet found a clear description of the way of modelling a semiheated zone, so I will attempt to summarize. Please correct/append where needed. - Exterior surfaces for... Last reply: Marcus Sheffer, Dec 10, 2020, 5:26 pm |
|
DES methodologyNC-v4 EAc2: Optimize Energy Performanceposted by Ricardo Sá on Oct 7, 2020, 5:47 am
Dear All, we’re currently working on LEED certification projects with the following characteristics:
Last reply: Tyler Thumma, Oct 20, 2020, 2:09 pm |
|
Off-site renewables calculated in Optimized Energy Performance in LEED v4NC-v4 EAc2: Optimize Energy Performanceposted by Deb Favaretto on Apr 21, 2020, 3:10 pm
Hi, Under LEED v4 for BD+C NC, can we count the energy savings from off-site renewables in our Optimized Energy Performance (Option 1) calculations to potentially claim maximum 18 points... Last reply: Jeff Ross-Bain, PE, LEED Fellow, WELL AP, Sep 25, 2020, 5:55 pm |
|
Proving Savings for a Utility-Owned Power PlantNC-v4 EAc2: Optimize Energy Performanceposted by Michael Hill on Sep 17, 2020, 11:36 am
I am wondering if anyone has any thoughts on how/if energy savings could be demonstrated for a Utility-Owned Electric Power Plant (just the plant itself). Obviously the majority of the energy... Last reply: Marcus Sheffer, Sep 18, 2020, 3:38 pm |
|
Multiple Pilot Credit (EApc111 7 EApc95) Implementation on EAc2NC-v4 EAc2: Optimize Energy Performanceposted by Rahil Shah on Jul 29, 2020, 12:06 pm
Hello Everyone, I hope everyone is doing well and staying safe. I have a LEED-NC v4 project. For energy performance prerequisite and credit (EAp2 and EAc2), we are using... Last reply: Marcus Sheffer, Jul 29, 2020, 1:48 pm |