I saw a couple comments about applying the requirements of this Pilot Credit in a building other than 2 to 3 stories.
Open parking under the building
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Rasita Masalskyte on
Dear all, We have a case where an open parking garage is located on the ground floor (under the building). Apparently, no exchaust system can be applied in this case.
Campus Projects, overlapping boundaries
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Michele Helou on
MPR Supplemental Guidance page 16 states that projects in phases may have an overlapping boundary. Let's say phase 1 included shared drive and parking and it does NOT earn SSc7.1 or SSc8.
How to specify for v4 LEED compliance
Data-Centers-NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Lissa Spitz on
Any recommendations on specs for the v4 MR credits? For example, we used to say 10% recycled materials required.
Single certification for physically distinct structures
NC-v4 MPR2:Must use reasonable LEED boundariesposted by NAMRATA GUPTA on
We are pursuing LEED for a hotel cum resort project with 80 individual villas plus main admin block, spa block, utlity blocks etc.
Smoking areas in places of congregation or pedestrian traffic
CS-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Katherine Mariano on
Hello, We are currently doing a Campus project registered under CS.
unfinished space simulation
NC-2009 EAp2:Minimum Energy Performanceposted by Hongyun Zhou on
My building has four floors, and 4th flr is left empty for future use.
Minimum Energy Performance
NC-v4 EAp2:Minimum energy performanceposted by Alexandra Mazzoni on
Hello, I have a question regarding equivalent standards : Is there an USGBC approved equivalent standard for projects located in France ? Many thanks in advance for your assistance.
Manufacturing Location to Distance Jobsite
CI-2009 MRc5:Regional Materialsposted by Hope Peg on
Hi Everyone!! I need help- please.. National Gypsum Sheathing is manufactured in Mount Holly North Carolina and my Project is located In Silver Spring , Maryland .
Dist. Center - Light polution
Warehouses-NC-v4 SSc6:Light pollution reductionposted by Antonio Macedo Filho on
If the design of a distribution center worked 24 hours in 3 shifts, even at night, could we not get that credit? If we use external lighting with zone presence sensors would not it be possible?