CxA Experience ValidationCS-v4 EAc1: Enhanced Commissioningposted by Michaël Briffaz on Oct 19, 2022, 9:21 am
Hey, We would like to submit the experience and references for a... |
|
Defining Minimum Scope of Work of MBCx to Optimize the Investment Cost for The Building OwnerCS-v4 EAc1: Enhanced Commissioningposted by Titinant on Oct 1, 2020, 5:29 am
Referring to LEED V4 EAc1 guideline, MBCx is the integration of 3 components: (1) Permanent energy monitoring systems, (2) Real-time energy analysis, (3) Ongoing... Last reply: Scott Bowman, Apr 26, 2021, 12:25 pm |
|
CxA Role- Limited central plant installedCS-v4 EAc1: Enhanced Commissioningposted by Ciaran McCabe on Nov 5, 2019, 1:15 pm
Hi, We are working on a LEED project where the client is considering installing minimal central HVAC plant as part of the core and shell works. Therefore the role of the... Last reply: Scott Bowman, Feb 28, 2020, 4:10 pm |
|
Monitoring-based Cx for CS projectsCS-v4 EAc1: Enhanced Commissioningposted by Shannon Oletic on Mar 14, 2019, 3:31 pm
What are the required measurement points for a core and shell project? Our project is a small core and shell building designed for retail, with limited M+E equipment (ERVs, RTUs, lighting... Last reply: Dave Hubka, Aug 13, 2019, 1:09 pm |
|
CS EA credit Enhanced Cx- who can serve as CxACS-v4 EAc1: Enhanced Commissioningposted by Deeta Bernstein on Jul 22, 2019, 2:08 pm
Any precedent in pursuing the Enhanced... Last reply: Scott Bowman, Aug 11, 2019, 5:30 pm |
|
Scope of Envelope CommissioningCS-v4 EAc1: Enhanced Commissioningposted by Michelle Rosenberger on Apr 25, 2018, 1:50 pm
We have a core and shell warehouse project that has no tenant buildout, i.e., no conditioned space, and therefore no thermal envelope. We interpret the vague requirements for envelope... Last reply: Elizabeth Cassin, Apr 30, 2018, 11:17 pm |
|
Envelope CommissioningCS-v4 EAc1: Enhanced Commissioningposted by Agnieszka Rylska on Sep 25, 2017, 12:49 pm
Hi, I have a question about Envelope Commissioning. For commercial building what tests are nessesery ? Air leakge testing is enough ? Or should I also test the building with thermal... |
|
Building Envelope Seasonal Testing & General CommentCS-v4 EAc1: Enhanced Commissioningposted by Brian Salazar on Aug 3, 2017, 2:37 pm
Hi! In general, the guidelines for this credit are...very general and vague. For example "Verify Seasonal Testing" -- Are there specific guidelines or requirements under Seasonal Testing that... Last reply: Dave Hubka, Aug 15, 2017, 8:46 pm |
|
Documentation upload to LEED OnlineCS-v4 EAc1: Enhanced Commissioningposted by Erin Rowe on Jul 7, 2017, 2:51 am
We are just getting ready to submit LEED CI V4... Last reply: Dave Hubka, Aug 15, 2017, 8:28 pm |
|
Different CxA for Construction other than one hired duringDesignCS-v4 EAc1: Enhanced Commissioningposted by mohammad Hassan on Jun 1, 2017, 4:50 am
Can a different... Last reply: Dave Hubka, Aug 15, 2017, 8:18 pm |