Topic

Enhanced Commissioning

NC-v4 EAp1: Fundamental commissioning and verification
posted by saif eddine majdaoui on Jun 25, 2019, 2:26 am

We are working on a big project, we are the LEED subcontractor (consultant) of the general contractor (All trades), 
The owner gave all LEED responsibilities to the general contractor, so...

Last reply: Dan Forino PE, CCP, LEED AP BD+C, WELL AP, Jun 25, 2019, 1:44 pm

"durability"

NC-v4 EAp1: Fundamental commissioning and verification
posted by Tom Kennedy on Jun 5, 2019, 6:39 pm

The Pre-req...

Drawing Review

NC-v4 EAp1: Fundamental commissioning and verification
posted by Steve Connelly on Mar 1, 2018, 9:18 am

Is a drawing review of the building envelope required by EAp1 Fundamental...

Last reply: Scott Bowman, May 25, 2019, 12:12 am

Envelope Design Review for LEED V4 Commissioning under Fundamental Cx

NC-v4 EAp1: Fundamental commissioning and verification
posted by Rohit Upadhyay on Apr 24, 2019, 7:55 pm

Hi Everyone,

Can someone clarify what is the extent of envelope design review by a Commissioning Authority (...

Phased Cx for a phased project

NC-v4 EAp1: Fundamental commissioning and verification
posted by Peter Doo on Apr 15, 2019, 4:55 pm

We are working on a comprehensive renovation and addition of an Art Center at an independent high school. The project will be phased; existing system upgrades and building renovation in phase 1...

Current Facilities Requirements and O&M Plan

NC-v4 EAp1: Fundamental commissioning and verification
posted by Chris Bennett on Mar 22, 2019, 12:30 pm

I am trying to determine if there a specific requirements regarding how the Current Facilities Requirements and O&M Plan is provided.

Does the information required to be included in...

Last reply: Chris Bennett, Mar 28, 2019, 11:02 am

Daylight Sensor and/or Occupancy Sensor

NC-v4 EAp1: Fundamental commissioning and verification
posted by Purva Saxena on Feb 11, 2019, 1:33 am

Are primary side-lighted areas to be provided with Daylight Sensor, even though these spaces (conference room, meeting rooms, private cabins with area less than 250 sq. ft.) are already provided...

Additions to Existing Cold Storage Facility

NC-v4 EAp1: Fundamental commissioning and verification
posted by Dustin Norton on Jan 23, 2019, 2:33 pm

I am working on a project that includes a large existing cold storage facility that will essentially double in size after renovations. Based on the design and layout of the project, it appears...

Last reply: Dan Forino PE, CCP, LEED AP BD+C, WELL AP, Jan 23, 2019, 2:49 pm

When to hire a Commissioning Agent

NC-v4 EAp1: Fundamental commissioning and verification
posted by Peter Davis on Mar 7, 2018, 3:58 pm

We were alerted to this project in Design Development Phase and the next phase has been progressing while we have been hiring and negotiating with the prospective...

Last reply: Teresa Stern, Jan 2, 2019, 2:27 pm

Electrical Commissioning Scope

NC-v4 EAp1: Fundamental commissioning and verification
posted by Renee Azerbegi on Sep 24, 2015, 6:25 pm

We have several clients who are implementing LEED v4. While the changes in Fundamental and Enhanced...

Last reply: Jim Waldrep, Nov 13, 2018, 2:59 pm