Forum » NC-v4 EAp1
Loading...
Topic

CxA to be an individual

NC-v4 EAp1: Fundamental commissioning and verification
posted by Omar ElRawy on Oct 2, 2018, 5:33 pm

Concerning all projects (either under or above 20,000 sqft), can the...

Last reply: Scott Bowman, Sep 11, 2019, 8:21 pm

Electrical Commissioning Scope

NC-v4 EAp1: Fundamental commissioning and verification
posted by Renee Azerbegi on Sep 24, 2015, 6:25 pm

We have several clients who are implementing LEED v4. While the changes in Fundamental and Enhanced...

Last reply: Scott Bowman, Sep 11, 2019, 8:15 pm

Phased Cx for a phased project

NC-v4 EAp1: Fundamental commissioning and verification
posted by Peter Doo on Apr 15, 2019, 4:55 pm

We are working on a comprehensive renovation and addition of an Art Center at an independent high school. The project will be phased; existing system upgrades and building renovation in phase 1...

Last reply: Scott Bowman, Aug 11, 2019, 6:13 pm

Envelope Design Review for LEED V4 Commissioning under Fundamental Cx

NC-v4 EAp1: Fundamental commissioning and verification
posted by Rohit Upadhyay on Apr 24, 2019, 7:55 pm

Hi Everyone,

Can someone clarify what is the extent of envelope design review by a Commissioning Authority (...

Last reply: Scott Bowman, Aug 11, 2019, 6:06 pm

"durability"

NC-v4 EAp1: Fundamental commissioning and verification
posted by Tom Kennedy on Jun 5, 2019, 6:39 pm

The Pre-req...

Last reply: Scott Bowman, Aug 11, 2019, 5:56 pm

Enhanced Commissioning

NC-v4 EAp1: Fundamental commissioning and verification
posted by saif eddine majdaoui on Jun 25, 2019, 2:26 am

We are working on a big project, we are the LEED subcontractor (consultant) of the general contractor (All trades), 
The owner gave all LEED responsibilities to the general contractor, so...

Last reply: Scott Bowman, Aug 11, 2019, 5:49 pm

EAp1-Fundamental Commissioning and Verification- OPR / BOD

NC-v4 EAp1: Fundamental commissioning and verification
posted by Maria Peralta on Jul 26, 2019, 3:38 am

Hello, I have a question regarding the...

Last reply: Scott Bowman, Aug 11, 2019, 5:26 pm

Drawing Review

NC-v4 EAp1: Fundamental commissioning and verification
posted by Steve Connelly on Mar 1, 2018, 9:18 am

Is a drawing review of the building envelope required by EAp1 Fundamental...

Last reply: Scott Bowman, May 25, 2019, 12:12 am

Current Facilities Requirements and O&M Plan

NC-v4 EAp1: Fundamental commissioning and verification
posted by Chris Bennett on Mar 22, 2019, 12:30 pm

I am trying to determine if there a specific requirements regarding how the Current Facilities Requirements and O&M Plan is provided.

Does the information required to be included in...

Last reply: Chris Bennett, Mar 28, 2019, 11:02 am

Daylight Sensor and/or Occupancy Sensor

NC-v4 EAp1: Fundamental commissioning and verification
posted by Purva Saxena on Feb 11, 2019, 1:33 am

Are primary side-lighted areas to be provided with Daylight Sensor, even though these spaces (conference room, meeting rooms, private cabins with area less than 250 sq. ft.) are already provided...