Log in
Forum » NC-v4 WEc4
Topic

process water- restaurant?

NC-v4 WEc4: Water metering
posted by Agnieszka Szydlowska on Oct 29, 2019, 8:15 am

We have a New construction project - offices with a restaurant on the groud floor. Does anyone know if water use for the purpose of the restaurant can be considered process water?

Last reply: Olga Yuil, Jan 25, 2021, 10:40 pm

Is "electric water coolers" a drinking water supply equipment

NC-v4 WEc4: Water metering
posted by Jorng-ren Chern on Dec 2, 2020, 9:46 pm

We got this review comment

1. The documentation does not confirm that the non-fixture usage (e.g. electric water coolers and janitors sinks) is measured and can be deducted from the...

heat pump

NC-v4 WEc4: Water metering
posted by Francesco Passerini on Feb 19, 2018, 5:13 am

In order to achieve this credit, permanent water meters can be installed also for "Boiler with aggregate projected annual water use of 100,000 gallons (378 500 liters) or more, or boiler of more...

Last reply: Joanna Switzer, Oct 26, 2020, 3:11 pm

Simple buildings with only restroom fixtures and irrigation

NC-v4 WEc4: Water metering
posted by Susan Di Giulio on Jun 11, 2020, 3:14 pm

I have this question for several university projects: the only water interior use in the buildings is restrooms. Therefore, the building water meter is already metering the entire interior use,...

Last reply: Ben Stanley, Jul 9, 2020, 11:27 am

Submeter on exterior hose bibs

NC-v4 WEc4: Water metering
posted by Jason Garvens on Sep 12, 2018, 9:52 am

Is this credit's intent satisfied by having a second submeter serving a buildings exterior hose bibs (in addition to a...

Last reply: Emily Purcell, Feb 7, 2020, 11:08 am

Indoor plumbing fixtures and fittings only?

NC-v4 WEc4: Water metering
posted by Amgad Khattab on Jan 1, 2020, 8:48 am

f the only subsystem available in the project is (Indoor plumbing fixtures and fittings), Are we eligible to earn this Credit for a core and shell project?

Which Systems to Submeter?

NC-v4 WEc4: Water metering
posted by Kyle G. Pearson on Oct 8, 2019, 1:54 pm

We have four systems on our project that we could potentially submeter.  However, from reading the LEED V4 Reference Guide, and this short article - ...

Last reply: Kyle G. Pearson, Oct 11, 2019, 11:31 am

80%- how to determine 80% of flush and flow fixtures

NC-v4 WEc4: Water metering
posted by Sue Bryant on Oct 9, 2019, 11:52 pm

The requirement is to meter 80% indoor plumbing fixtures and fittings as described in WEp Indoor Water Use reduction: lavs, toilets, urinals, showers. If you meter all Residential units in a...

Dmestic Hot Water heating "capacity"?

NC-v4 WEc4: Water metering
posted by Karen Joslin on Sep 10, 2018, 1:02 pm

I'm surrounded by really smart mech engineers and we need clarification about how to measure the total combined heating capacity. We use tanks plus on demand (larger capacity...

Last reply: Karen Joslin, Sep 30, 2019, 11:36 am

Submetering Process Water- Assisted Living laundry

NC-v4 WEc4: Water metering
posted by Jennifer Rennick on Jul 18, 2019, 1:12 am

I'm working on an assisted living facility that will have laundry machines in just a few of their residential units, but generally have a central laundry facility for the building. Would the...

Last reply: Sarah Nugent, Sep 17, 2019, 3:05 pm