Test makeup water or blowdown water?NC-v4 WEc3: Cooling tower water useposted by Omar Elrawy on Nov 16, 2020, 8:35 pm
Dear all, Should we test ... Last reply: David Hubka, Nov 17, 2020, 2:15 pm |
|
Existing Campus CEP Cooling TowersNC-v4 WEc3: Cooling tower water useposted by Gregory Mason on Nov 15, 2020, 6:58 pm
Hi all, I'm wondering if anyone has documented this credit for an existing campus CEP. The current cycles need to increased to achieve the minimum cycles of concentration. It is expected... |
|
Cooling tower cyclesNC-v4 WEc3: Cooling tower water useposted by Manuel Martin Delgado on Mar 30, 2016, 7:30 am
Hi, I am a bit confused with the credit requirements for achieving 1 point. Last reply: Damienne Harfouche, Sep 23, 2020, 12:11 pm |
|
plasterNC-v4 WEc3: Cooling tower water useposted by Sue Bryant on Aug 17, 2020, 4:39 pm |
|
City Potable Water Analysis ReportsNC-v4 WEc3: Cooling tower water useposted by Saif Abdulameer on Apr 11, 2018, 10:54 am
Can I use the potable water analysis reports from the city utility to calculate the cycles? Last reply: David Hubka, Aug 14, 2020, 4:25 pm |
|
No Cooling Tower- Baseline system categorizationNC-v4 WEc3: Cooling tower water useposted by Michelle Bombeck on Jul 27, 2020, 7:53 pm
According to the Appendix G, our building does not fall into the allowable project type for System 7 or 8 but only because Appendix G indicates that the building has to be more than 5... Last reply: Maria Porter, Aug 10, 2020, 8:31 am |
|
Hybrid recoolerNC-v4 WEc3: Cooling tower water useposted by Florian Schmidtchen on Aug 8, 2017, 6:05 am
Dear all, Our MEP Engineer wants to implement a dual recooling system/the hybrid recooler of the series KAVH. For our building type and the location in Germany with strong temperature... Last reply: Petra Holoubkova, Apr 28, 2020, 4:04 am |
|
Master Site: Substitution credit from LEED v4 to LEED v4.1NC-v4 WEc3: Cooling tower water useposted by Mario Angelo Pinoli on Dec 17, 2019, 11:22 am
Hi everyone, we registered a project as a Master Site in LEED v4 version and we would like to replace the WEc3 credit with the same credit of the LEED v4.1 version. The credit can'... Last reply: David Hubka, Dec 17, 2019, 4:35 pm |
|
Timing of water testingNC-v4 WEc3: Cooling tower water useposted by matt kaye on Dec 9, 2019, 8:15 am
Do you test the potable water anytime? or should the testing of the water be done after cooling tower start up process? |
|
Filtering Water in Cooling Tower Basin opposed to Filtering Makeup WaterNC-v4 WEc3: Cooling tower water useposted by Alyssa Faircloth on Aug 28, 2019, 12:12 pm
Our project is an apartment building with retail and utilizes its own chiller plant with cooling towers. We would like to reduce water loss through blowdown by treating the water in the cooling... |