City Potable Water Analysis Reports

NC-v4 WEc3: Cooling tower water use
posted by Saif Abdulameer on Apr 11, 2018, 10:54 am

Can I use the potable water analysis reports from the city utility to calculate the cycles?

Last reply: Jason Packer, Mar 27, 2024, 11:57 am

100% nonportable water for cooling tower

NC-v4 WEc3: Cooling tower water use
posted by Thomas Tran on Feb 13, 2019, 4:08 am

Hi,

LEED reference document says in the Required document Table (page 309):

- Nonportable water analysis (if use 100% nonportable water) -------------------------------------- 2...

Last reply: Afogreen Build, Mar 7, 2024, 3:24 am

Water Analysis- (Maximum concentration exceed 10)

NC-v4 WEc3: Cooling tower water use
posted by Osman Faroq on Sep 21, 2023, 1:30 am

Dear All, 

We have conducted water anaysis and showed that the water is with highe quality withount any treatment/filteration and with maximum cyecle of concnetaroin of 16...

Hybrid recooler

NC-v4 WEc3: Cooling tower water use
posted by Florian Schmidtchen on Aug 8, 2017, 6:05 am

Dear all,

Our MEP Engineer wants to implement a dual recooling system/the hybrid recooler of the series KAVH. For our building type and the location in Germany with strong temperature...

Last reply: Stephani Carter, Aug 2, 2023, 6:09 pm

Cooling Tower is used for process water (Factory project)

NC-v4 WEc3: Cooling tower water use
posted by Youssef Hisham on Mar 1, 2023, 5:54 am

We are in a factory project and the cooling tower is used for the process water for the factory equipment. So, Does the cooling tower credit requirement applies to our project ?

Last reply: Afogreen Build, Jul 19, 2023, 12:29 am

Using Dry cooling tower

NC-v4 WEc3: Cooling tower water use
posted by Michael on May 25, 2023, 11:00 pm

My factory project doesn't use regular Cooling towers, they use Dry coolers (dry cooling towers), which don't use water at all. Can we claim to achieve this credit by no using make-up water?...

Last reply: Afogreen Build, May 30, 2023, 8:29 pm

No cooling tower- ACP

NC-v4 WEc3: Cooling tower water use
posted by Charalampos Giannikopoulos on Jul 30, 2018, 1:48 pm

Hi all! Does anyone know whether the “No Cooling Tower” credit is an alternative substitute of “Cooling tower water use” credit or a pilot credit? In other words, would a project which meets all...

Last reply: Arif Azfar Ahmad Sofian, Dec 16, 2022, 2:07 am

Master Site: Substitution credit from LEED v4 to LEED v4.1

NC-v4 WEc3: Cooling tower water use
posted by Mario Angelo Pinoli on Dec 17, 2019, 11:22 am

Hi everyone, 

we registered a project as a Master Site in LEED v4 version and we would like to replace the WEc3 credit with the same credit of the LEED v4.1 version.

The credit can'...

Last reply: Eric Anderson, Nov 8, 2022, 1:12 pm

Who can supply Potable water analysis results?

NC-v4 WEc3: Cooling tower water use
posted by ed HvacSimulator on Apr 17, 2022, 10:44 pm

Hello,

We are performing the credit Cooling Tower Water Use and our MEP contractor can supply the Potable water analysis results. Is this possible because we only read "...

Last reply: Maeve Donohue, May 5, 2022, 12:18 pm

Missing parameters in water analysis- urgent query

NC-v4 WEc3: Cooling tower water use
posted by Nermin Hegazy on Jan 14, 2022, 1:32 am

Hello all!

I was able to get the water analysis report from the responsible party, however they don't measure the Silicon oxide parameter, can we still target this credit if all other...

Last reply: Zeynep Cakir, Jan 14, 2022, 12:36 pm