No landscape area- Is this credit not applicable?NC-v4 WEp1: Outdoor water use reductionposted by Sonali Rawat on May 3, 2023, 2:13 am
Hi, For one of our projects in the MENA region, there is no landscape area at all due to the nature of the project. Is this credit not applicable in that case and we are not eligible for... Last reply: Andrey Kuznetsov, Oct 4, 2024, 12:22 am |
|
Minimal landscape areaNC-v4 WEp1: Outdoor water use reductionposted by Emily Purcell on Apr 9, 2020, 4:41 pm
Hi, I'm aware of the guidance for this prereq/credit that allows projects with no landscaping to achieve the prereq and two points under Option 1 of the credit. I'm... Last reply: Alexia Anastassiadis, Aug 21, 2024, 9:18 am |
|
Total Water Demand for Irrigation (Tank sizing, Plant Sizing, Network Sizing etc.)NC-v4 WEp1: Outdoor water use reductionposted by Tariq Muhammad on Oct 15, 2023, 3:57 am
Dear All, As we know that the total water demand of irrigation do impact the Water storage Tank sizing, Plant sizing and Network sizing. The LEED calculator do provide the end rusult with... Last reply: Afogreen Build, Apr 18, 2024, 9:00 pm |
|
Is Zoysia japonica turf?NC-v4 WEp1: Outdoor water use reductionposted by Linh Dang on Dec 23, 2022, 6:17 am
Dear all LEED user expert We use Zoysia japonica for landscape. now we dont know is Zoysia turf or groundcover? if it is turf , how can i approve that is groundcover? Thanks... Last reply: Afogreen Build, Mar 25, 2024, 9:13 pm |
|
WEp1_manual wateringNC-v4 WEp1: Outdoor water use reductionposted by Alex Edwards on Apr 29, 2022, 3:27 am
Hi, we have a project for NC, they plan to use manual watering system for the landscape outside the house (they have water dispensers available, the staff will discharge into the bucket and water... Last reply: Santiago Avila, Mar 19, 2024, 5:32 am |
|
No-irrigation documentationNC-v4 WEp1: Outdoor water use reductionposted by Alexia Anastassiadis on Dec 12, 2022, 6:22 am
Hi all, Last reply: Afogreen Build, Mar 17, 2024, 9:04 pm |
|
How outdoor water is calculated for green walls (vertical vegetations)?NC-v4 WEp1: Outdoor water use reductionposted by Leo LeQuoc on Feb 25, 2024, 6:24 pm
Our team is working with a new construction project where design team wants to apply green walls (vertical vegetations) outside the building facade. As LEED calculator only defines vegetation on... |
|
Calculations for Projects outside USANC-v4 WEp1: Outdoor water use reductionposted by María Fernanda Aguirre on Sep 4, 2014, 12:18 pm
Hi! How is that projects outside USA may use the Excel (in the pr and cr resources) or the WaterSense tool if the Zip Code must be introduced?. Last reply: Lidia Johansen, Dec 12, 2023, 11:56 am |
|
2-year Establishment PeriodNC-v4 WEp1: Outdoor water use reductionposted by Kun liu on Jun 19, 2023, 3:43 pm
We are working on a project in South Holland, IL. WE PREREQUISITE _ Outdoor Water Use Reduction option 1 requires a maxiumn two-year establishment period. ... Last reply: Afogreen Build, Jul 27, 2023, 2:23 am |
|
Irrigation Establishment Period Flexibility / Regional AdjustmentsNC-v4 WEp1: Outdoor water use reductionposted by Pooja Sannamani on Mar 8, 2022, 5:16 pm
For the WE pre-requisite and credit Outdoor Water Use Reduction, specifically Option 1 (No Irrigation Required), can the irrigation system installed go beyond the maximum two-... Last reply: emily reese moody, Jul 20, 2023, 11:09 pm |