Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

How to send the documentation for the campus credits

LEED Guidance for Campuses and Multiple Buildings
posted by  Alicia Villanueva  on 

We are certifying 2 buildings within a Master Site and we have registered both of them: Building A Building B Then, we have linked them with the Block Registration Tool. We don't know how to up

5
Technical Customer Service Specialist
GBCI
LEEDuser Premium Member
105 thumbs up
Thu Feb 28, 2013, 2:02 pm

LEED Canada V1.1 and LEED Canada 2009. Credits MRc4 and MRc7

NC-2009 MRc7:Certified Wood
posted by  Keith Robertson  on 

In the LEED Canada reference guide V1.0, page 295 for the credit MRc4, it is stated under “Synergies and Trade-Offs […] Recycled content materials cannot be included in calculations for MR Credits

6
Default Avatar
President
Solterre Inc.
LEEDuser Premium Member
47 thumbs up
Wed Feb 27, 2013, 8:06 pm

glare control devices on skylights?

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Erin Holdenried  on 

Does anyboday know if glare control devices need to be provided on skylights?

7
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Wed Feb 27, 2013, 7:21 pm

Natural vegetation

EBOM-2009 WEc3:Water Efficient Landscaping
posted by  AshLee Eustace  on 

I'm working on a building with a large portion of natural vegetation which is not irrigated. There is also a separate area of turf, trees, shurbs that is irrigated.

5
Principal
Ackerstein Sustainability, LLC
LEEDuser Expert
545 thumbs up
Wed Feb 27, 2013, 5:14 pm

Metal Studs - Hawaii

CI-2009 MRc5:Regional Materials
posted by  Nicole Kimoto  on 

I'm sure this question has been asked before...so if the metal studs are rolled at a site within 500 miles of project location, but the raw material comes from outside 500 mile, does that % of meta

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Feb 27, 2013, 1:54 pm

RE: LEED CI and furniture

CI-2009 MRc4:Recycled Content
posted by  Chris Miller  on 

Just to clarify, in LEED CI (based on both the materail data spreadheet available on LEED online & in the LEED CI reference guide v2009) it states furniture cost is to be included in our total

3
President
REAL Building Consultants
LEEDuser Premium Member
27 thumbs up
Wed Feb 27, 2013, 2:12 am

Snow blowers and Snow plow

EBOM-2009 SSc2:Building Exterior and Hardscape Management Plan
posted by  Nelina Loiselle  on 

Do I need to include our snow blower in the Powered Equiptment inventory?

2
Tue Feb 26, 2013, 9:46 pm

Ecotect Analysis

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Jorge Lopez de Obeso  on 

We are using Ecotect analysis 2011 to document credit IEQ 8.1.

4
Architect
Bau Arktitekter
LEEDuser Basic Member
3 thumbs up
Tue Feb 26, 2013, 9:12 pm

Public road in the middle of Master Site

LEED Guidance for Campuses and Multiple Buildings
posted by  LEED Pro Consultant  on 

Hi! We are working on a project in which there are 2 office buildings (both will seek LEED Certification) within the Master Site boundary, but it is separated in the middle by a public road.

2
Mon Feb 25, 2013, 10:50 pm

Already Registered as Master Site (Campus) and NOW Want Group?

LEED Guidance for Campuses and Multiple Buildings
posted by  Michelle Bracewell-Musson  on 

Hello All, 1.) What is the process for how to switch to Group if we are already registered as MS?

2
Mon Feb 25, 2013, 10:34 pm