Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Submit a Design Credit during Construction Application Review with a Split Submittal

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Felicia Ridgeway  on 

My project is a split submittal, with a Design Preliminary Application review and a Construction Application review.

3
Tue Mar 20, 2018, 7:19 pm

Integrative Process for Health Promotion

NC-v4 INc1:Innovation
posted by  Brian Salazar  on 

I am working with a healthcare company on a new facility.

1
Thu Mar 22, 2018, 6:31 pm

How to document for LEED v4 and for WELL #62

CI-v4 EQc7:Daylight
posted by  Lou Niles II  on 

any help, suggestions appreciated.Hello Todd, great piece on the credit(s). thank you.

1
Wed Mar 21, 2018, 11:58 am

Will "Overhead vegetated canopy" to be included in calculation for 25% minimum outdoor space?

NC-v4 SSc3:Open space
posted by  Qian P  on 

To satisfy SSc3 open space requirement, "A minimum of 25% of that outdoor space must be vegetated (turf grass does not count as vegetation) or have overhead vegetated canopy." 

0

Will "Overhead vegetated canopy" to be included in calculation for 25% minimum outdoor space?

NC-v4 SSc3:Open space
posted by  Qian P  on 

To satisfy SSc3 open space requirement, "A minimum of 25% of that outdoor space must be vegetated (turf grass does not count as vegetation) or have overhead vegetated canopy." 

0
2
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Mon Mar 19, 2018, 7:34 pm

Individual Occupant Space - Task Lighting

NC-v4 EQc6:Interior lighting
posted by  Daniel Thien  on 

I've seen several questions on this forum that address task lighting, but I still am a bit confused.

0

What is the difference between extraction point and manufactured point?

CI-v4 MRc5:Building product disclosure and optimization - material ingredients
posted by  Carrie Willis  on 

Is manufactured point where we actually make the casegoods in our plant? Or is it where the panels are made from the extracted raw material?

1
Thu Mar 22, 2018, 6:47 pm

LEED Rating System Change

LEED Rating System Selection
posted by  Magda Aghababyan  on 

I have already registered a project under LEED v2009 Existing Building Operations and Maintenance.

1
Thu Mar 22, 2018, 6:49 pm