Forum quick links
Calculate reclaimed water in "Indoor Water Use Reduction Calculator"
NC-v4 WEc2:Indoor water use reductionposted by Hanh Truong on
Dear all,
EPD of Products/Materials
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Ann E on
We are in our process of gathering and submitting our papers for LEED requirements but we our having a trouble regarding the EPD since none of our suppliers have a certification on hand.
LEEDv4 CI Office space - VRF software to calculate fan energy
CI-v4 EAc3:Advanced energy meteringposted by Jane Christen on
We have a LEEDv4 CI Commercial Office space where in addition to those already metered, lighting, plug, etc., the other end uses are heating, cooling, and fan energy.
Prefererd parking spaces in Valet Parking - Hotel project
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Arub Vijay on
I have a hotel building project with 145 parking (Valet parking) which is less than the authority requirements of 165.
Extended Producer Responsibility - documentation
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Tristan Roberts on
Has anyone pursued this credit using Extended Producer Responsibility? Did you find that you had to meet any specific documentation requirements?
ISO 50001 ACP
EBOM-v4 EAp1:Energy efficient best management practicesposted by veronica oyarzun on
For LEED EBOM 2009 there are ACP´s available through the ISO 50.001. How does it works for v.4?
LEED V2009 NC - DES Option 1 in Energy Model
NC-2009 EAp2:Minimum Energy Performanceposted by SSN Energy Model on
Hi,
achievability with green roofs
NC-v4 SSc2:Site development - protect or restore habitatposted by Jens Apel on
This project is previously developed, though existing buildings have been demolished and basically the site is a sand area with some vegetation on it that developed after demolition.
Distance between bicycle storage and bicycle network
NC-v4 LTc6:Bicycle facilitiesposted by Lise Dannesboe on
Hi.
"Design or locate the project such that a functional entry or bicycle storage is within a 200-yard (180-meter) walking distance or bicycling distance from a bicycle network"
EPD
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Ann E on
Hi! Is EPD for finish products/materials only or also for raws? Can you give examples of products/materials with EPD's?