EAc1 baseline and proposed systems
NC-v4 EAc2:Optimize energy performanceposted by John McCullough on
The problem I am having is that I have to select a system for the baseline model which is System 7 VAV with Reheat, based on the advise of ASHRAE Table G3.1.1A , however the proposed system for the
Water metering required for tenants?
CS-v4 WEc4:Water meteringposted by Ricardo Sá on
A large office building is being certified using LEED Core & Shell.
Table 6.8.1D - System 2
NC-2009 EAp2:Minimum Energy Performanceposted by Charalampos Giannikopoulos on
We are simulating a hotel building with System 2 PTHP.
Alternative Compliance Path Pilot Credit
NC-v4 INc1:Innovationposted by Paula Rantanen on
What is the difference between Alternative Compliance Path Pilot Credit (such as No Cooling Towers) and Pilot Credit?
Design review of Innovation credits
CS-v4 INc1:Innovationposted by Michael Smithing on
LEED Online has only one form for all of the innovation credits in v4. Does this mean that they must all be submitted together, or is it possible to submit the credit once in the design stage
Charger locations in assigned parking for condo tower
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Susan Di Giulio on
Hi, We are working on a campus project with luxury condo towers.
Preferred Parking (Carpool parking) Management Strategies for Stadium
NC-v4 LTc7:Reduced parking footprintposted by Quentin Jackson on
Are there different carpool/preferred parking strategies outlined by LEED for game days and non-game days? The stadium being constructed will attract 30,000 people on game days
District Heating & Process Loads
NC-2009 EAp2:Minimum Energy Performanceposted by Dónal O'Connor on
Hi all,
Swiss Reference standard for Primary Energy and GHG
Pilot-Credits EApc95:Alternative Energy Performance Metricposted by Susann Geithner on
Anyone working on a Swiss project I recommend using SIA380, which list the applicable GHG and primary energy values.
Innovation: Walkable project site
CI-v4 INc1:Innovationposted by Sabrina Cescolini on
Hello everyone,
Long-time LEEDuser user, first-time poster.