Forum » NC-v4 SSc5
Loading...
Topic

Parking Under Cover and SRI Requirement

NC-v4 SSc5: Heat Island Reduction
posted by Summer on Oct 9, 2019, 4:35 am

Hi,

Our project have a 100% parking space under cover which means we are okay with option 2. Do we need to comply with...

Last reply: Summer, Oct 9, 2019, 9:23 pm

Does the independent lab we use need to be accredited for compliance with ISO/IEC Standard 17025?

NC-v4 SSc5: Heat Island Reduction
posted by Ashley O'Neill on Oct 31, 2018, 2:03 pm

Will a testing report be rejected if the lab follows CRRC-1 but is not an ISO/IEC Standard 17025 lab?

Last reply: emily reese moody, Jul 30, 2019, 6:16 pm

LTc5- Heat Island Reduction- examplary performance

NC-v4 SSc5: Heat Island Reduction
posted by Maria Peralta on Jul 4, 2019, 5:17 am

Hello, I have a doubt about the examplary performance of this credit.

In the project with I am working doesnt has a parking and I achieved the option 1, so at is says in the LEED guide:...

Last reply: emily reese moody, Jul 16, 2019, 3:55 pm

Other Buildings within LEED Boundary

NC-v4 SSc5: Heat Island Reduction
posted by Max Krueger on May 9, 2019, 3:40 pm

Should other buildings within the LEED boundary be counted towards this credit? These existing buildings will not be getting certified.

Parking spaces under tree canopy can be counted under the Option 2: Parking under cover

NC-v4 SSc5: Heat Island Reduction
posted by Thomas Tan on Feb 18, 2019, 1:55 am

Dear LEED Experts,

Our parking spaces consist of two parts: one park is under a roof...

Last reply: Thomas Tan, Mar 14, 2019, 5:33 am

SSc5 Option 1: Non Roof component solely meeting criteria but satistfies required EQUATION Values

NC-v4 SSc5: Heat Island Reduction
posted by Olawale Taiwo on Feb 19, 2019, 9:48 pm

OPTION 1. Non-Roof and Roof (2 Points)

In this reference per the Reference Guide the criteria given is an equation referencing a higher value of the three variables (Non-Roof, High...

Last reply: emily reese moody, Mar 12, 2019, 9:51 pm

Are Parking areas for Buses and Taxis included in Option 2

NC-v4 SSc5: Heat Island Reduction
posted by Stephan Zweig on Feb 21, 2019, 5:46 am

Hello to all,

Do you  have any suggestion if I have to include for Option 2 of heat island  reduction credit the following:

1) Parking lots for Buses?

2) Taxis waiting areas...

Last reply: emily reese moody, Mar 12, 2019, 9:31 pm

Zero Lot line project and Heat Island Reduction

NC-v4 SSc5: Heat Island Reduction
posted by Stephan Zweig on Feb 27, 2019, 3:18 am

Hello to all,

I have a zero...

Portion of gound level paving under building

NC-v4 SSc5: Heat Island Reduction
posted by Tilly Ford on Feb 15, 2018, 7:10 pm

Hi,

I have a building for which the ground level steps back and therefore the paving is shading by the building itself. I can't quite tell how to account for this, is it either:

a....

Last reply: Olawale Taiwo, Feb 14, 2019, 12:18 pm

How to calculate multi-level Decks / Patios

NC-v4 SSc5: Heat Island Reduction
posted by Sara Hickman on Nov 26, 2018, 5:56 pm

The project will have several patios / decks throughout, many of which will be covered by a large cantilever above (being the building itself). Should this be calculated under non-roof...

Last reply: emily reese moody, Jan 22, 2019, 3:39 pm