Please advise the canopy connected between two building is considered as roof or non roofNC-v4 SSc5: Heat Island Reductionposted by Ekkapharb Sriussadaporn on Dec 7, 2022, 8:55 pm
Greeting. Can anyone advise wheter the canopy connected between two building is consider as roof or non roof according to the SSc5 Heat Island Reduction. The under canopy is road and... Last reply: Sandra Baer, Mar 27, 2023, 12:29 pm |
|
Relevance in Scandinavian climateNC-v4 SSc5: Heat Island Reductionposted by Martin Maribo on Mar 16, 2023, 11:03 am
I am living in a country where the highest energy costs are heating, not cooling, our buildings. And where we enjoy the few days in a year, when the sun is warming up courtyards or sidewalks so... Last reply: emily reese moody, Mar 16, 2023, 11:32 am |
|
Greenhouse- SRI ValueNC-v4 SSc5: Heat Island Reductionposted by Irene Chung on Jul 28, 2022, 9:59 am
Can a greenhouse be excluded when doing credit calculation? If not, is there a default... Last reply: Kara Strong, Feb 17, 2023, 12:47 pm |
|
Data Sheet or Laboratory test report?NC-v4 SSc5: Heat Island Reductionposted by Samer Alhmdan on Jul 20, 2017, 8:46 am
Hello, Do we need a laboratory test report to substantiate the... Last reply: emily reese moody, Feb 9, 2023, 1:17 am |
|
LEED v4 Heat Island Reduction- include elevator shafts and stairwell enclosures in roof calcs?NC-v4 SSc5: Heat Island Reductionposted by julie baines on Mar 4, 2022, 6:24 pm
Hi all, I am working on a major renovation of an existing downtown campus building. The entire roof of the building is being redone with white TPO. However, the existing elevator and stair... Last reply: emily reese moody, Oct 14, 2022, 5:06 pm |
|
Gravel- Heat Island ReductionNC-v4 SSc5: Heat Island Reductionposted by Pooja Sannamani on Dec 9, 2020, 8:23 pm
Hello, Can gravel be used meet the Heat Island Reduction credit in V4/4.1 provided it meets the... Last reply: Grace Friedhoff, Sep 2, 2022, 4:49 pm |
|
Weighted average SRI values for option 2 parking under coverNC-v4 SSc5: Heat Island Reductionposted by Julio Fernandez Amodia on Aug 26, 2022, 2:43 am
Hi, I am currently pursuing this LEED credit for a mall building. Most of the parking area (>75%) is underground, and part of it has a building above and other parts have an outdoor... Last reply: emily reese moody, Aug 31, 2022, 9:42 pm |
|
Total Site Paving AreaNC-v4 SSc5: Heat Island Reductionposted by Maria Perzon on Mar 7, 2018, 5:13 am
I am not sure about the definition of "Total Site Paving Area". I have a already developed site with a building that is to be majorly rebuilt. Could I use the old site paving area as my reference... Last reply: Irene Chung, Jun 29, 2022, 10:46 am |
|
LTc5- Heat Island Reduction- examplary performanceNC-v4 SSc5: Heat Island Reductionposted by Maria Peralta on Jul 4, 2019, 5:17 am
Hello, I have a doubt about the examplary performance of this credit. In the project with I am working doesnt has a parking and I achieved the option 1, so at is says in the LEED guide:... Last reply: emily reese moody, Apr 30, 2022, 12:43 pm |
|
SRI VALUE OF SOLAR ROOFNC-v4 SSc5: Heat Island Reductionposted by Shameen Dharmasena on Nov 4, 2021, 7:26 am
Hello, If a roof totally covered with Solar Panels, then how to calculate... Last reply: emily reese moody, Nov 7, 2021, 4:59 pm |