Log in
Forum » CS-v4 LTc8
Topic

Signage of preferred parking

CS-v4 LTc8: Green vehicles
posted by Erkki Seinre on Mar 27, 2020, 8:20 am

A project has smaller parking on ground level in front of the building and larger parking underground. The project team is proposing allocating all above-ground level parking as preferred parking...

Electric Vehicle Charging Point in the Green Lease Agreement

CS-v4 LTc8: Green vehicles
posted by Francis McNulty on Jun 15, 2016, 5:49 am

Hi All,

I am working on a LEED v4 Core and Shell project which is proposing to install the infrastructure for the installation of an Electric Vehicle Charging Point. The infrastructure...

Last reply: Instra Ingenieros, Mar 2, 2020, 6:33 am

V4.1 Option2 (EV-ready infrastructure) parameters of providing raceways?

CS-v4 LTc8: Green vehicles
posted by Ronnel Flores on Nov 20, 2019, 8:29 pm

Our project vies for this credit and chose to pursue Option 2 Electric Vehicle Charging Infrastructure.

We need to make 8 parking spaces EV ready. These 8 spaces are scattered 2 spaces per...

electric vehicle charging stations and whole-building energy simulation

CS-v4 LTc8: Green vehicles
posted by Sareet Benayahu on Dec 30, 2018, 7:22 am

hello,

Our leed core and shell office building is planning on installing electrical vehicle charging stations for 2% of parking spaces. My question is about the electricity usage of these...

Last reply: Ricardo Sá, Sep 5, 2019, 2:00 pm