Topic

how can attachments (drawings, images) be sent in a CIR?

NC-v4 IPc1: Integrative process
posted by Sara BENLOUBA on May 25, 2023, 4:45 am

Dear Everybody,

We would like to send a...

Last reply: Marcus Sheffer, May 25, 2023, 5:47 pm

How contact GBCI for their advice on technical matters

NC-v4 IPc1: Integrative process
posted by Sara BENLOUBA on May 24, 2023, 4:59 am

Dear everybody, 

Please, how do you contact...

Last reply: Marcus Sheffer, May 24, 2023, 10:08 am

IP Worksheet- Very confusing language

NC-v4 IPc1: Integrative process
posted by Maria Grimm on Jan 23, 2019, 2:55 pm

I'm working on a project where we completed a very thorough IP analysis during concept design. I am finding now, however, that filling out the IP worksheet is extremely painful due to very...

Last reply: , May 22, 2023, 2:20 pm

GFA calculation for extremely thick walls

NC-v4 IPc1: Integrative process
posted by Filippo Weber on Sep 2, 2022, 4:56 am

Hi,
I’m working on a certification on a very old building with walls having an average width of 120 cm (4 ft). The GFA calculation is therefore extremely high in relation to the net floor...

Last reply: Filippo Weber, Sep 2, 2022, 9:37 am

Certification time

NC-v4 IPc1: Integrative process
posted by Helena Garcia on Jan 30, 2020, 9:45 am

Hi everyone,

Does anyone know if there is a time limit or a deadline from when a project is registered until certification is achieved?

Thank you in advance.

...

Last reply: Luisa Scambia, Nov 24, 2021, 6:31 am

Pre-selected sites, can a project still opt for Integrative Process credit?

NC-v4 IPc1: Integrative process
posted by Nermin Hegazy on Jun 20, 2021, 8:50 am

We are studying the feasibility of acheiving LEED certification for a series of floors in an office building.

Can the proejct still acheive the Integrative process credit even if the sites...

Last reply: Bipin Karki, Jun 23, 2021, 12:40 pm

Project relocated to a new site

NC-v4 IPc1: Integrative process
posted by Sara Goenner Curlee on Nov 4, 2020, 1:47 pm

I have a project that just completed the IP credit requirements before the end of SD, and now finds itself likely needing to relocate to a different site. The proposed new site is about 10 miles...

Last reply: Sara Goenner Curlee, Nov 4, 2020, 2:21 pm

Integrative process phase

NC-v4 IPc1: Integrative process
posted by Marion THIBAULT on Feb 24, 2020, 4:04 pm

Hello,
My client wishes to have his project certified in LEED V4.
The project is in the construction phase. However, there are still technical and architectural design studies. Is...

Last reply: Catalyst Partners, Feb 25, 2020, 9:00 am

Simple box model

NC-v4 IPc1: Integrative process
posted by Edgar Arevalo on May 1, 2017, 5:49 pm

Ok.... So I'm working on my first LEED v4 BD+C project, and we're looking to pursue the IP credit. As I'm already generating simple box energy model, the requirements state that I target at...

Last reply: Oliver Pearce, Oct 11, 2019, 6:08 am

When exactly to submit for this credit?

NC-v4 IPc1: Integrative process
posted by Sayali G on Sep 13, 2019, 3:37 pm

Hey All,

I am very new to the LEED Certification thus just quiet confused about the credit, our firm has just completed 30% of Design Development Phase for a project and were thinking to...

Last reply: Sayali G, Sep 16, 2019, 10:38 am