Topic

Baseline for Projects with Several Physically Distinct Structures

NC-v4 MPR3: Must comply with project size requirements
posted by Mike Mentzos on Sep 15, 2023, 6:57 am

All,

We are currently working on a hotel project, which consists from several buildings the sum of them is about 4,000 square meters. Each individual bulding is not greater than 2,300...

VRV/VRF PIPING INSULATION

NC-v4 MPR3: Must comply with project size requirements
posted by Fotis Kotsopoulos on Apr 15, 2021, 1:12 pm

Tristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11477 thumbs up April 15, 2021- 1:54 pm Hi Fotis, I'm not sure I understand what LEED credit or requirement this is in reference to. Could you please post this question the forum on this site specific to the LEED credit requirement you are working on? thanks! Log in or register to post comments ...

Last reply: Tristan Roberts, Apr 15, 2021, 1:54 pm

Certification Timeline for a registered Project

NC-v4 MPR3: Must comply with project size requirements
posted by Radhesh Sarkar on Nov 30, 2020, 1:11 am

Project is underconstruction and 60 % completion of gross project work. Now project is registered under LEED v4 BD+C of https://www.leedonline.com/...

Last reply: Afogreen Build, Dec 10, 2020, 8:01 pm

Differences between design phase and construction phase

NC-v4 MPR3: Must comply with project size requirements
posted by JORDI CASTELLANO on Oct 15, 2018, 4:09 am

hello everyone,
our project has achieved the design phase of LEED review.
We are working in construction phase, and we have some distribution interiors differences from design phase...

Last reply: Tristan Roberts, Oct 15, 2018, 3:48 pm

Occupancy Calculations in LEEDv4

NC-v4 MPR3: Must comply with project size requirements
posted by Arathi Gowda on Jan 3, 2018, 7:07 pm

In the new simplified Project Information forms there is no longer a calculator for...

Last reply: Olga Yuil, May 25, 2018, 7:03 pm

30% female 70% male for Police facility FTE

NC-v4 MPR3: Must comply with project size requirements
posted by Lawrence Lile on Jan 4, 2018, 8:42 pm

We are working on a police facility under LEED V4.  Currently the department is 12% female.  Nationally, police departments, according to a study we will cite, are 14% female.  We are installing...

Last reply: Tristan Roberts, Jan 7, 2018, 3:02 pm

Is there a minimum % of new floors, walls, ceilings, etc. for a major renovation of an existing building under NC-v4?

NC-v4 MPR3: Must comply with project size requirements
posted by Craig Wilson on Sep 11, 2017, 12:06 pm

Is there a minimum % of  new floors, walls, ceilings, etc. for a major renovation of an existing building under NC-v4? We are trying to decide between O+M and NC for a major renovation. Thank you...

Last reply: Craig Wilson, Sep 12, 2017, 11:52 am

Project size extended in the middle of construction

NC-v4 MPR3: Must comply with project size requirements
posted by wachira sosaeng on Apr 13, 2017, 12:07 pm

My project registered for LEED 2009, mixed use building with 2 towers on the same podium. At first the project registered for LEED only 1 tower but later on the owner decided to registered for...

Last reply: Daniel Hartsig, May 30, 2017, 1:12 pm

Projects with Several Physically Distinct Structures

NC-v4 MPR3: Must comply with project size requirements
posted by Inés Alomar on Jul 10, 2014, 7:19 am

We are starting with the process of certifying a project under v4 for BD+C.
It is a hotel with a main building with a main building of 5,000 square meters plus 2 additional small buildings...

Last reply: NAMRATA GUPTA, May 21, 2017, 7:33 am

Toilet Building meet MPR?

NC-v4 MPR3: Must comply with project size requirements
posted by Harry Flamm on Apr 4, 2017, 5:38 pm

Does a stand-alone one-story building, of 1,600 sf, that contains just public toilets and sinks in a park setting, and no full-time occupancy, meet minimum program requirements for LEED v4 New...

Last reply: Tristan Roberts, Apr 5, 2017, 12:31 pm