Topic

Change Certification level after Preliminary Design & Construction review

CS-v4 MPR1: Must be in a permanent location on existing land
posted by Ronnel Flores on May 8, 2020, 5:02 am

Is it allowable that for Preliminary Design & Construction (D&C) submission, the project attempt for example, Silver rating. But after preliminary D&C review/comment, and preparing...

Last reply: Tristan Roberts, May 15, 2020, 3:22 pm

LEED C&S (sans C?)

CS-v4 MPR1: Must be in a permanent location on existing land
posted by Thomas Gibbons on Oct 25, 2018, 5:21 pm

Hi folks,

Have a question that I believe relates to Interpretation #10102 and incomplete spaces (though I’m open to suggestions if I’m off-base). 

Project: LEED v4 Core & Shell...

TSLA upload- where should we do it?

CS-v4 MPR1: Must be in a permanent location on existing land
posted by Instra Ingenieros on Jan 10, 2018, 7:10 pm

Dear all,
At the moment we are gathering the information required for a Core&Shell project. We haven't registered it yet in LEEDonline since we are still debating on the version we'll...

Last reply: emily reese moody, Jan 11, 2018, 8:39 pm

Documents Required For pre-certification for LEED V4 Core Shell

CS-v4 MPR1: Must be in a permanent location on existing land
posted by Aqrab Ali Rana on Nov 4, 2016, 9:12 am

I have project of apartment in Pakistan, What are documents required for all credits actually??Do I have to submit all documents as I submit for preliminary review or just to tell the strategies...

Last reply: Tristan Roberts, Nov 4, 2016, 11:25 am