Excluding a building in LEED boundary from LEED requirementNC-v4 MPR1: Must be in a permanent location on existing landposted by Osman Faroq on Mar 1, 2023, 11:47 pm
Dear LEED users, I'm working in a project targeting LEED silvder under LEED v4 BD+C:NC. In our project, in addtion to the main buillding (LEED targeted), we have anogher supporting... Last reply: Afogreen Build, Apr 3, 2024, 9:17 pm |
|
Prefabricated or modular structure BuildingsNC-v4 MPR1: Must be in a permanent location on existing landposted by VISHAL JAIN on Aug 17, 2022, 8:53 am
Hello, Would like to know more details on how "Prefabricated or modular... |
|
USGBCs online web-based reference guideNC-v4 MPR1: Must be in a permanent location on existing landposted by Kavita Karmarkar on Nov 19, 2018, 10:34 am
Posting this question here since it does not belong to any credit in particular. We are considering getting a subscription to the web-based reference guide on the USGBC website. Their... Last reply: Michelle Robinson Schwarting, Apr 28, 2022, 6:26 am |
|
Project located on reclaimed landNC-v4 MPR1: Must be in a permanent location on existing landposted by Nermin Hegazy on Nov 28, 2021, 1:03 am
I would like to know what is LEED's take on developing a site which is on reclaimed land. The land for the site is not specifically claimed for the project, it has been reclaimed about 15-20... Last reply: Tristan Roberts, Dec 3, 2021, 1:57 pm |
|
Green Plaque website no response and no Certificates for Projects?NC-v4 MPR1: Must be in a permanent location on existing landposted by Robert Fernandez on Apr 1, 2020, 4:36 pm
Hello, Not sure where to post this but is anyone else having trouble with Green Plaque? I just received access to one of my certified projects and the congratulatory letter was formatted... Last reply: Robert Fernandez, Apr 2, 2020, 11:55 am |
|
usgbc leed online site very slow and times outNC-v4 MPR1: Must be in a permanent location on existing landposted by Christopher Cowie on Jul 3, 2018, 4:32 pm
why is the usgbc leed online site so slow? I can bearly work on line and the site keeps timing out. Last reply: Lyle Axelarris, Jul 24, 2019, 10:04 am |
|
Delete a Campus.NC-v4 MPR1: Must be in a permanent location on existing landposted by Guillermo Hernandez Espinoza on Oct 22, 2018, 11:32 pm
I create an example of a campus project registration with the sole objetive of guidance for a client so they can register their project themselves. After I finished a manual I notice there is no... Last reply: Guillermo Hernandez Espinoza, Oct 23, 2018, 3:58 pm |
|
Architectural Design Guideline for LEED platinum Project under CORE & SHEEL V4NC-v4 MPR1: Must be in a permanent location on existing landposted by Subrota Roy on Nov 28, 2017, 2:07 am
Hi, We are going to start Architectural drawing design of one project. ( Project targeted rating level PLATINUM Under CORE & SHEEL V4) Project data as follows : Total... Last reply: Tristan Roberts, Oct 15, 2018, 3:43 pm |
|
Project registrationNC-v4 MPR1: Must be in a permanent location on existing landposted by Kavita Karmarkar on Jun 1, 2018, 10:33 am
I am posting this here as this question is not really applicable to any credits / MPR. Is there a hard cut-off to when a project can register for LEEDv4 New Construction? Last reply: Tristan Roberts, Oct 15, 2018, 3:43 pm |
|
Reclaimed land from seaNC-v4 MPR1: Must be in a permanent location on existing landposted by Bazeeth Ahamed K M on Apr 24, 2014, 6:12 am
"All LEED projects must be constructed and operated on a permanent location on existing land" So reclaimed land from sea(artificial island) would not be eligible for LEED V 4 as they are not... Last reply: Lyndane Dimas, Aug 8, 2018, 11:18 am |