Topic

Excluding a building in LEED boundary from LEED requirement

NC-v4 MPR1: Must be in a permanent location on existing land
posted by Osman Faroq on Mar 1, 2023, 11:47 pm

Dear LEED users, 

I'm working in a project targeting LEED silvder under LEED v4 BD+C:NC. In our project, in addtion to the main buillding (LEED targeted), we have anogher supporting...

Last reply: Afogreen Build, Apr 3, 2024, 9:17 pm

Prefabricated or modular structure Buildings

NC-v4 MPR1: Must be in a permanent location on existing land
posted by VISHAL JAIN on Aug 17, 2022, 8:53 am

Hello,

Would like to know more details on how "Prefabricated or modular...

USGBCs online web-based reference guide

NC-v4 MPR1: Must be in a permanent location on existing land
posted by Kavita Karmarkar on Nov 19, 2018, 10:34 am

Posting this question here since it does not belong to any credit in particular.

We are considering getting a subscription to the web-based reference guide on the USGBC website. Their...

Last reply: Michelle Robinson Schwarting, Apr 28, 2022, 6:26 am

Project located on reclaimed land

NC-v4 MPR1: Must be in a permanent location on existing land
posted by Nermin Hegazy on Nov 28, 2021, 1:03 am

I would like to know what is LEED's take on developing a site which is on reclaimed land.  The land for the site is not specifically claimed for the project, it has been reclaimed about 15-20...

Last reply: Tristan Roberts, Dec 3, 2021, 1:57 pm

Green Plaque website no response and no Certificates for Projects?

NC-v4 MPR1: Must be in a permanent location on existing land
posted by Robert Fernandez on Apr 1, 2020, 4:36 pm

Hello,

Not sure where to post this but is anyone else having trouble with Green Plaque? I just received access to one of my certified projects and the congratulatory letter was formatted...

Last reply: Robert Fernandez, Apr 2, 2020, 11:55 am

usgbc leed online site very slow and times out

NC-v4 MPR1: Must be in a permanent location on existing land
posted by Christopher Cowie on Jul 3, 2018, 4:32 pm

why is the usgbc leed online site so slow?  I can bearly work on line and the site keeps timing out.

Last reply: Lyle Axelarris, Jul 24, 2019, 10:04 am

Delete a Campus.

NC-v4 MPR1: Must be in a permanent location on existing land
posted by Guillermo Hernandez Espinoza on Oct 22, 2018, 11:32 pm

I create an example of a campus project registration with the sole objetive of guidance for a client so they can register their project themselves. After I finished a manual I notice there is no...

Last reply: Guillermo Hernandez Espinoza, Oct 23, 2018, 3:58 pm

Architectural Design Guideline for LEED platinum Project under CORE & SHEEL V4

NC-v4 MPR1: Must be in a permanent location on existing land
posted by Subrota Roy on Nov 28, 2017, 2:07 am

Hi,

We are going to start Architectural drawing design of one project. ( Project targeted rating level PLATINUM Under CORE & SHEEL V4)

Project data as follows :

Total...

Last reply: Tristan Roberts, Oct 15, 2018, 3:43 pm

Project registration

NC-v4 MPR1: Must be in a permanent location on existing land
posted by Kavita Karmarkar on Jun 1, 2018, 10:33 am

I am posting this here as this question is not really applicable to any credits / MPR.

Is there a hard cut-off to when a project can register for LEEDv4 New Construction?

Last reply: Tristan Roberts, Oct 15, 2018, 3:43 pm

Reclaimed land from sea

NC-v4 MPR1: Must be in a permanent location on existing land
posted by Bazeeth Ahamed K M on Apr 24, 2014, 6:12 am

"All LEED projects must be constructed and operated on a permanent location on existing land" So reclaimed land from sea(artificial island) would not be eligible for LEED V 4 as they are not...

Last reply: Lyndane Dimas, Aug 8, 2018, 11:18 am