Is a borrow pit considered "previously developed" land?

ND-v2009 SLLp5: Floodplain avoidance
posted by Jason Franken on May 13, 2015, 3:03 pm

Our project includes a large location that was disturbed and altered for use as a borrow pit during the construction of a nearby interstate...

Last reply: Eliot Allen, May 13, 2015, 3:46 pm

Floodplain Documentation

ND-v2009 SLLp5: Floodplain avoidance
posted by Bernard Sagaiyaraj on Mar 12, 2013, 10:13 pm

My project has failed the Stage 1 SLLp5 documentation.The project is in Malaysia and the state water department has no records to substantiate that the site has not been flooded before. Their...