Forum » ND-v2009 SLLp5
Topic | Recent |
---|---|
Is a borrow pit considered "previously developed" land?ND-v2009 SLLp5: Floodplain avoidanceposted by Jason Franken on May 13, 2015, 3:03 pm
Our project includes a large location that was disturbed and altered for use as a borrow pit during the construction of a nearby interstate... Last reply: Eliot Allen, May 13, 2015, 3:46 pm |
|
Floodplain DocumentationND-v2009 SLLp5: Floodplain avoidanceposted by Bernard Sagaiyaraj on Mar 12, 2013, 10:13 pm
My project has failed the Stage 1 SLLp5 documentation.The project is in Malaysia and the state water department has no records to substantiate that the site has not been flooded before. Their... Last reply: Eliot Allen, Mar 13, 2013, 11:18 am |