Forum quick links
Project is 1 building, waste is from 3 buildings
NC-2009 MRc2:Construction Waste Managementposted by Melissa Merryweather on
I have a building located in a campus. Only the office tower is undergoing LEED certification but all 3 area being built concurrently.
Hose bibs - permanent irrigation
CS-2009 WEc1:Water Efficient Landscapingposted by Petra Hajná on
Hi LEEDers. I tried to pursue the credit via calculation because the roject will use the hose bibs on regular basis for the building lifetime, not as a temporary solution.
Two buildings connected by a bridge
NC-2009 MPR4:Must comply with minimum floor area requirementsposted by Eric Bautista on
My apology for posting a query quite not related to this section. Can I register a project consisting of two (2) identical buildings connected by a suspended bridge and both located within the dec
*sensationalism alert*!
posted by Kathryn West on
This is a very helpful and detailed article.
Recycled content in road underlay material
NC-2009 MRc4:Recycled Contentposted by Agnieszka Rylska on
In our project coal slate which is a waste from a coal mine will be used to create the underlay for the roads and the building. Can this be included in recycled content calculations?
Re-use of excavated rocks onsite for construction.
NC-2009 MRc2:Construction Waste Managementposted by Palak Varshney on
Project Location: India. The project construction site has rock bed. These rock are excavated, broken and re-used in construction on-site.
IDp1 Health Mission Statement
Healthcare-v2009 IDp1:Integrated project planning and designposted by Kristy M. Walson on
I'm working on my first LEED for Healthcare project and was wondering if anyone out there has a sample Health Mission Statement I can use as a template?
Dedicated Exhaust Clarification
CI-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Alana Spencer on
Hello, Could the exhaust of a high-density copy room be achieved via a 100% exhaust base building system?
LEED Boundary
CS-2009 MPR3:Must use a reasonable site boundaryposted by gabriel Morales on
We have a project with 2 commercial towers being designed to certify in CS, on the same land owner 2 residential towers (not LEED) are located.
Indoor Water Use Reduction - Impossible to Achieve????
EBOM-v4 WEc2:Indoor water use reductionposted by Meier Corporate Account on
Our dairy was built in 2014 with the most water efficient toilets and sinks on the market. (Urinals use no water).