Forum quick links
Waste Management
NC-2009 MRc2:Construction Waste Managementposted by Ali Scander on
Hello, I'm concerned about our project earning points for MRc2.
Two Identical Buildings
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Paula Hernandez on
Hi, we want to achieve the Precertification for a CS project. There are two office buildings, almost identical, on the same parcel. They share four underground parking levels.
Baseline Economizers
Retail-CI-v4 EAp2:Minimum energy performanceposted by Paula Hernandez on
Standard ASHRAE 90.1-2010 states that Outdoor air exonomizers shall be included in baseline HVAC systems 3 trhough 8, with the exception 6.5.1d: Systems that include a condenser heat recovery syste
Recycling area for MR Pre-req in a small historical building
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Veronica Reed on
Hello We are developing a ver small 12 room hotel in a historical landmark building in the historic center of Quito, all houses in the block from late 1800's, thus the building was a former single
Technical Advice
EBOM-2009 EAc6:Emissions Reduction Reportingposted by Eleftherios Zacharakis on
Hi, we used ENERGY STAR Portfolio Manager to estimate the CO2 emissions of a project.
Tenant Space Energy Modeling
CI-v4 EAp2:Minimum energy performanceposted by Paula Hernandez on
To comply with EA_p2 we are goint to develo the energy simulation of the Tenant Space Scope of Work. My questions are: 1.
Peak Transients
Schools-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by timothy thomas on
The following is review comment I received for SS 4.2. "Refer to the comments within PIf3: Occupant and Usage Data.
Option 1 - What to include in Site Area calc
CS-2009 SSc2:Development Density and Community Connectivityposted by Jay Murray on
I have 15 properties that fall within my Density Radius. I did not include the public roads in this square footage calculation, nor did I include a public parking lot that fell within my radius.
Re-Appeal for a data center
posted by Jordan Kirrane on
Hi, We have a project that underwent an appeal in order to get EAp2/c1. The results of the Appeal (D+C) were that the prereq was granted, but not the points from the credit.
Recycling Areas for Multifamily/commercial project
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Rob Hink on
I am working on a multifamily housing project with commercial spaces. The commercial spaces are on the first 2 floors. There will be individualized retail space and office space.