Forum quick links
Spaces that are not in scope
NC-v4 EAp2:Minimum energy performanceposted by Edgar Arevalo on
I am currently working on an energy model for a major renovation project under LEED BD+C. There are two major spaces (both lunch rooms) that are not going to be served by the new HVAC sy
lengths of the permanent entryway systems
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Ydo Schuuring on
LEED v4 describes to install a permanent entryway systems at least 10 feet (3 meters) long in the primary direction of travel, to capture dirt and particulates entering the building at regularly us
Baseline Heat Rejection System 7
CS-v4 EAc2:Optimize energy performanceposted by Ciaran McCabe on
Hi I am using Baseline system 7 and I notice that the heat rejection energy is higher than expected.
Ongoing commissioning work only focus on ECMs of energy audit?
EBOM-v4 EAc3:Ongoing commissioningposted by JAMES CHEN on
Guide mentioned ongoing commissioning builds on energy analyses and implementation of energy conservation measures (ECMs).
Architect 50
posted by Kate Bubriski on
I see that the Architect 50 questions this year are organized around AIA 2030 Commitment reporting. I have a question about how people are answering them.
Re-upholstering sytems furniture for reuse- Panel systems.
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Tracy Backus on
Can anyone advise on the certification required, if any, for the textiles that are being applied to used panel systems in a LEED v3 Ci Project? Does the cut yardage of the textile have to hav
New Warehouse - Diverse Uses Option
Warehouses-NC-v4 LTc4:Surrounding density and diverse usesposted by Johanna Scogin on
If I am working on a new warehouse, and the "warehouse" options don't work for this site ("option 1-development & adjacency" and "option 2-transportation resources"), can I go for the diverse u