Forum quick links
Permeable pedestrian sidewalk
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by MARCIO OROFINO on
Would anyone inform if permeable pedestrian sidewalk on the ground, recharging groundwater, may be counted towards the achievement of the restored área and ecollogic site feature? Tks
Repair Bays
NC-2009 IEQc2:Increased Ventilationposted by Esperanza Adams on
Repair bay do not have Ventilation requirement but they do have exhaust requirement. Per the increased ventilation credit would we have to exhaust 30% more outside air?
Parking Islands
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Zachary Guren on
Has anyone successfully used parking lot islands planted with native vegetation to contribute toward this credit?
What is the correct way to find the width of the street?
Pilot-Credits PC14:Walkable Streetsposted by Grace Heicher on
The credit requirements do not seem to be consistent in defining the street width.
Components to be included in the calculations for MRc5
CI-2009 MRc5:Regional Materialsposted by Diana Nezamutinova on
Should lighting be included in the calculations? It is neither a Division 12 component, nor a construction material.
Green Cleaning Policies
EBOM-2009 IEQp3:Green Cleaning Policyposted by Wendy Lao on
Are there any examples of GC policies that could be shared?
Silicone sealant for glass block installation
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Adi Negara, LEED AP BD+C on
Dear all, Does the silicone sealant used for the glass block installation need to comply with the maximum VOC requirements of this credit?
SSc3.3 Alternative Transportation - Parkign Availability
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Ashley Quinn on
We are working on a project for LEED-CI.
Define Movable Furnishings of IAQ Testing
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Holly Himes on
The Reference Guide states movable furnishing such as workstations and partitions must be in place during IAQ testing.
Authentication of water fixture installation date
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by David Mortensen on
Had anyone successfully used as-built drawings to verify the installation date of water fixtures?