Forum quick links
Campus Credits q
posted by Kathryn West on
As of today, can campuses be documented using www.leedonline.com or do we need to use the new site https://www.usgbc.org/leedonline.new/ ? No one staffing the phones at GBCI can answer me.
usgbc ID credit catalog - green cleaning
NC-2009 IDc1:Innovation in Designposted by Carrie Laurendine on
USGBC published a catalog of ID credits that have been pursued.
Green Cleaning - referencing LEED EB
NC-2009 IDc1:Innovation in Designposted by Carrie Laurendine on
Apparently LEED-NC projects seeking green cleaning ID credit should reference LEED-EB green cleaning requirements.
use of green power during construction
NC-2009 IDc1:Innovation in Designposted by Charles Winkler on
Does anyone know whether I can obtain an Innovation Credit for use of green power during construction? I have a 15,000 sf New Construction project.
Campus PV PPA
NC-2009 EAc2:On-Site Renewable Energyposted by Chad Coleman on
I am hoping that someone can shed some light on the way a Campus PV PPA will be viewed for EAc1 and EAc2 in LEED NCv2009.
ASHRAE 90.1-2007 - Section 8.4 - Voltage drop
NC-2009 EAp2:Minimum Energy Performanceposted by Ali Helmy on
We are working on the LEED certification for a hospital building with 10 floors height.
Default fixture usage - showers in a swimming pool facility
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Ricardo Sá on
In a swimming pool facility it is very likely that almost all users do take a shower before leave.
IEQc8.2 Exemplary Performance
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by Ron Dean on
Hi: About the Measure 1: "90% or more of regularly occupied spaces have multiple lines of sight, to vision glazing, in different directions at least 90 degrees apart"...
TOTAL MATERIAL COST for PRE-CAST CONCRETE COMPONENTS
NC-2009 MRc4:Recycled Contentposted by anupam verma on
Currently I am working on a project registered under v2.3. My question is related with TOTAL MATERIAL COST for PRE-CAST CONCRETE COMPONENTS in MR credit 4 & 5.
EAc5 Measurement and Verification Option 3
NC-2009 EAc5:Measurement and Verificationposted by Dan Milewski on
Is Option 3 (1 point) - Meet MPR 6 through compliance Opttion 1: Energy and Water Data Release Form. Is option 3 available as a stand alone option or only as a exemplary performance if Options 1