Is Option 3 (1 point) - Meet MPR 6 through compliance Opttion 1: Energy and Water Data Release Form.

Is option 3 available as a stand alone option or only as a exemplary performance if Options 1 or 2 are achieved (i.e. do not need to achieve options 1 or 2 to get the one point).

Thanks