Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

ASHRAE Standard 62.1–2010, Sections 4–7

EBOM-v4 EQp1:Minimum indoor air quality performance
posted by  Jonathan Miller  on 

Can someone list the minimum requirements of ASHRAE Standard 62.1–2010, Sections 4–7? Thanks much.

2
Default Avatar
VP, Sustainability Services
Cassidy Turley
LEEDuser Basic Member
0 thumbs up
Fri Feb 7, 2014, 3:26 pm

Toilet Exhaust with Exhausted Air to Storage

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Marina Andrade  on 

Hi, I'm working on a project for a deposit. On site there is a large exhaust fan on the roof.

6
Fri Feb 7, 2014, 1:33 pm

Material Cost Calculation

NC-2009 MRc4:Recycled Content
posted by  Loretta Maine  on 

I have a steel supplier who completed a very nice Material Reporting Form for me with a great breakdown of every one of the many products they provided for our project.

7
Default Avatar
The Crossland Way Coordinator/LEED Coordinator
Crossland Construction Company, Inc.
LEEDuser Basic Member
0 thumbs up
Thu Feb 6, 2014, 4:17 pm

EPA Tools for Schools for IEQ c1.1

EBOM-2009 IEQc1.1:IAQ Best Management Practices—IAQ Management Program
posted by  Will Bianchi  on 

Our elementary school has adapted the EPA Tools for Schools Policy to address all components of indoor air quality. Tools for schools seems to cover the I-Beam criteria.

3
Green Mystic in Residence
LEEDuser Basic Member
75 thumbs up
Thu Feb 6, 2014, 3:23 pm

Brown Field redevelopement

NC-2009 SSc3:Brownfield Redevelopment
posted by  Sahar Abi-Ziki  on 

Hello, Due to budget issues, our client wants to decontaminate a portion of the site and not the entire site (only the areas were we are doing interventions).

2
Principal
Studio4, LLC
LEEDuser Expert
120 thumbs up
Thu Feb 6, 2014, 3:07 pm

Submitting in excel format instead of filling out form

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Kathryn West  on 

Has anyone ever submitted an excel sheet for this credit in lieu of filling out the whole form.

2
Thu Feb 6, 2014, 1:44 pm

Building Space Flushout

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Weld Morse  on 

I am working on a Massachusetts public works maintenance facility. it involves 2 separate structures; an office building and a garage.

2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Wed Feb 5, 2014, 10:20 pm

New Midrise Rating Selection Guidance

LEED Rating System Selection
posted by  Michelle Rosenberger  on 

Has anyone seen the newest release of the Rating System Selection Guidance (dated 1/27/14 on the download page no date on the document)? It indicates that multifamily residential buildings of 4 to

4
LEED Project Reviewer, LEED AP BD+C, Senior LEED Specialist
Certifications Department Manager, Epsten Group, Inc.
LEEDuser Basic Member
26 thumbs up
Wed Feb 5, 2014, 8:06 pm

On-site duct manufacture

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Mauricio Ramirez  on 

Hi. One of the projects in which I'm involved will have on-site HVAC duct manufacture. Does this practice has any inconvenient for the compliance with the credit IEQc3.1?

3
Wed Feb 5, 2014, 5:56 pm

LEED-CS sunset date

General forums
posted by  Tristan Roberts  on 

I believe the standard GBCI policy on sunset dates is six years from the last date that a project could register under the given rating system.

2
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Wed Feb 5, 2014, 4:21 pm