Log in
Forum » Schools-2009 EAc1
Topic

SSc8 and EAc1 Disconnect?

Schools-2009 EAc1: Optimize Energy Performance
posted by Amalia Hicks on Jun 2, 2014, 4:47 pm

For LEED v3 (2009) SSc8 - Light Pollution Reduction, the baseline exterior lighting power allowance uses ASHRAE 90.1-2007 Addendum i (which has similar values to 90.1-2010). I've read other...

Last reply: Marcus Sheffer, Jun 3, 2014, 10:14 am

Elevators (Lift/Escalators) & LEED EAC1 credit

Schools-2009 EAc1: Optimize Energy Performance
posted by Ameet AA on Apr 2, 2013, 12:48 pm

Can I include the Elevators (Lift/Escalators) in EAC1 credit calculation using the whole building simulation method?

I was told by an Elevator supplier that Regenerative Converter in lift...

Last reply: Jeremy Rapoza, Apr 16, 2014, 4:11 pm

Energy Modeling and Building Shading

Schools-2009 EAc1: Optimize Energy Performance
posted by Joanna Jenkins on May 21, 2010, 8:07 am

We are working on an elementary school project and we're trying to correctly model the sun shading. We understand we should "count" the benefits from permanent sun shading devices designed at...

Last reply: Marcus Sheffer, Apr 3, 2014, 10:23 am

Energy Modeling donations

Schools-2009 EAc1: Optimize Energy Performance
posted by Stantec BG+LU FW on Apr 11, 2013, 4:31 pm

Does anyone know of groups who offer donations for energy modeling? I am working with an NGO in a third world country to get their LEED certification on an extremely sustainable building, but the...

Last reply: Marcus Sheffer, Nov 4, 2013, 5:49 pm

EAC1 Existing Building Renovation Baseline Rotations Required?

Schools-2009 EAc1: Optimize Energy Performance
posted by Matt Humphreys on Jan 23, 2013, 11:24 am

Is it required in the EAC1 energy model to perform the baseline building rotations of 90, 180 and 270º for an existing building that is being renovated provided the building footprint and...

Last reply: Marcus Sheffer, Jan 24, 2013, 3:41 pm

Electricity rate structure with demand penalty

Schools-2009 EAc1: Optimize Energy Performance
posted by James Chueh on Aug 21, 2012, 1:57 am

There is penalty in our local electricity company's rate...

Last reply: James Chueh, Aug 22, 2012, 10:03 pm

EA Cr-1- Process Energy Cost less than 25%

Schools-2009 EAc1: Optimize Energy Performance
posted by April McGee-Flournoy on Aug 12, 2011, 10:05 am

Project K-12 school, The enegry calculation done for the entire building but the process enegry cost comes less than 25%.

What is the next step should I provide the supporting documents...

Last reply: Marcus Sheffer, Aug 12, 2011, 11:38 am

Greenhouse

Schools-2009 EAc1: Optimize Energy Performance
posted by Lisa Logan on Jul 26, 2011, 12:40 pm

Client is adding greenhouse to the school project - sort of late in the game. Does this space get included in our energy calcs? I am assuming yes and that there is no way around it.

Last reply: Marcus Sheffer, Jul 26, 2011, 5:03 pm

Heat sensors to control HVAC

Schools-2009 EAc1: Optimize Energy Performance
posted by Gendel Metlitsky on Jun 13, 2011, 12:08 pm

On May, 26 I was listening to webinar regarding Richardsville NEZ school presented by Joanie Hendricks, Public Relations Coordinator from Warren County PS, Tim Murley Superintendent WCPS, Kenny...

Last reply: Marcus Sheffer, Jul 26, 2011, 1:44 pm

Electric Rates

Schools-2009 EAc1: Optimize Energy Performance
posted by Laura Long on Mar 17, 2011, 3:11 pm

The electric company for our school project offers a rate...

Last reply: Marcus Sheffer, Mar 17, 2011, 4:47 pm