Pre-rinse spray valvesSchools-2009 WEp1: Water Use Reductionposted by Kelly Beisswanger on Sep 24, 2020, 10:41 am
Trying to figure out if I need to and how/where to include values for pre-rinse spray valve use. I am not going for the process water use reduction credit because the project won't meet other... Last reply: Bipin Karki, Sep 24, 2020, 3:49 pm |
|
Pre-Rinse Spray Valve Before 11/1/2011 addendaSchools-2009 WEp1: Water Use Reductionposted by Crina Bosch on Nov 4, 2013, 4:56 pm
Above states "If your project is registered after the 11/1/2011 addenda release then the pre-rinse spray valve flow rate must be 1.6 gpm or less in order to comply with the prerequisite. If your... Last reply: Carlie Bullock-Jones, Dec 30, 2015, 11:48 am |
|
Residential Type Sinks in Middle School ClassroomSchools-2009 WEp1: Water Use Reductionposted by Sara Zoumbaris on Jul 7, 2014, 11:38 am
Hi, We are working on a middle school that has 2, Home Economics classrooms with residential kitchen-style fixtures; I would assume these should be included within my calculation? By... Last reply: Carlie Bullock-Jones, Dec 30, 2015, 11:35 am |
|
Default Fixture use for a School Project (shower)Schools-2009 WEp1: Water Use Reductionposted by Markus Henning on Dec 3, 2014, 2:55 am
I am working on a school project and actualy calculating WEp1. I am wondering that the default fixture use for a school indicate no daly uses for a shower for students. Also the LEEDonline form... Last reply: Carlie Bullock-Jones, Dec 30, 2015, 10:55 am |
|
Classroom SinksSchools-2009 WEp1: Water Use Reductionposted by Donald Bonnett on Jun 21, 2010, 12:53 pm
Do classroom sinks, and art room sinks fall under lavatory sinks or are they not included in the baseline caculation. Last reply: Tristan Roberts, Nov 4, 2013, 9:25 pm |
|
10 second flow rateSchools-2009 WEp1: Water Use Reductionposted by Lauren Sparandara on Nov 26, 2012, 2:55 pm
I received the final comment for one of my LEED for Schools projects: "Metered faucet duration has not been revised from 10-second duration to the default 12-second duration as required.... Last reply: Carlie Bullock-Jones, Nov 26, 2012, 3:07 pm |
|
It is mentioned that well andSchools-2009 WEp1: Water Use Reductionposted by Ameet AA on Nov 20, 2012, 5:24 am
It is mentioned that well and pond water does not count for this credit. Last reply: Tristan Roberts, Nov 22, 2012, 7:01 pm |
|
school example in documentation toolkit?Schools-2009 WEp1: Water Use Reductionposted by William Weaver on Aug 29, 2012, 11:09 am
I was wondering if the LEEDuser team could provide an example of a completed template for a school project in the documentation toolkit. While I appreciate the example provided, it is a fairly... Last reply: William Weaver, Sep 12, 2012, 12:31 pm |
|
Private vs. Public Lavatory FaucetsSchools-2009 WEp1: Water Use Reductionposted by Alison Y Rivenburgh on Mar 17, 2011, 4:49 pm
I am working on two elementary schools, and the lower grade levels have private restrooms intended for individual student use in each classroom. The baseline for private lavatory faucets is 2.2... Last reply: Carlie Bullock-Jones, Sep 11, 2012, 11:38 am |
|
School Kitchen Pre-Rinse and Wash SinksSchools-2009 WEp1: Water Use Reductionposted by Art Irwin on Jun 1, 2011, 7:22 pm
I am working on a high school project that includes a kitchen with both a pre-rinse sink and a three-tub sink that will have two faucets. I see that both pre-rinse sinks and kitchen sinks are... Last reply: Carlie Bullock-Jones, Sep 11, 2012, 11:34 am |