developer owned design build project

NC-2009 EAc3:Enhanced commissioning
posted by  Chris Flint Chatto  on 

We are working on a design-build team developing a project that will be leased to a government agency.

1
Wed Apr 2, 2014, 1:51 pm

Sensor Type Flush Fixtures

CI-2009 WEc1:Water use reduction
posted by  Katherine Ann Resurreccion  on 

Hi Would Sensor activated flush fixtures like urinals and WCs have the same flow rate calulations as a sensor type flow fixture? Would it follow the default 12sec / 60 cycle?

1
Wed Mar 26, 2014, 12:31 pm

Not Regularly occupied

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Phillip Cook  on 

In LEED v2009, if a project has less than 1 annualized FTE occupancy it was not possible to achieve any of the IEQ points.

1
Wed Aug 6, 2014, 4:10 pm

Car park in basement

CS-2009 IEQc5:Indoor chemical and pollutant source control
posted by  Mike D  on 

If only four car parking spaces are located within the basement of the building, will they require separate exhaust even if they are not used regularly?

0

Late Start

Hospitality-NC-v4 IPc1:Integrative process
posted by  Annie Hwang  on 

We are in the final stages of completing construction documents for a new construction hotel. The owner recently expressed an interest in having the hotel LEED certified.

1
Wed Mar 26, 2014, 6:37 pm

Upgrades

EBOM-2009 EAc2.1:Existing building commissioning - investigation and analysis
posted by  Andres Giraldo  on 

Hi, If I did a narrative description about the HVAC at the begining of LEED project (PIf4), but know we have done some updates because of the level 1 audit, so do I need to change the HVAC narrativ

1
Wed Mar 26, 2014, 4:36 pm

Bonus points?

NC-2009 MRc2:Construction waste management
posted by  Craig Mahoney  on 

Hello, I work for a commercial waste hauler and C&D recycling facility. We have recently started recycling scrap drywall from new construction projects.

1
Wed Mar 26, 2014, 10:21 pm

Can the project team purchase the RECs?

CI-2009 EAc4:Green power
posted by  Crista Shopis  on 

The reference guide states that "the tenant AND project team can purchase Green-e accredited RECs".

1
Wed Mar 26, 2014, 8:51 pm

Increase total furniture cost with reused furniture value?

CI-2009 MRc5:Regional materials
posted by  Maria Porter  on 

We have an actual total furniture budget that we use when we calculate the percentages (20 or 10 % regional).

1
Mon Mar 31, 2014, 5:41 pm

Environmental Labs in Office Building

EBOM-2009 IEQc2.2:Controllability of systems - lighting
posted by  Victoria Bauer  on 

Hi, I am working on a LEED project in an office building that has environmental labs. Some of the labs have workstations to input data, but not a permanent desk for an occupant.

1
Mon Mar 31, 2014, 11:48 pm