Forum quick links
LEED V4 BD+C vs ID+C
posted by Tracy Marquis on
We are renovating approximately 13,000 SF (with is about 50% of the first floor) of a 177,000 SF building. The renovation includes interior square footage as well as some major envelope work
Side Lighting - Clerestory
NC-2009 EAp2:Minimum Energy Performanceposted by Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C on
Hello everyone, happy Friday!
Are Vision Strips Included in Low-Emitting Materials?
CI-v4 EQc2:Low emitting materialsposted by Diana Smiciklas on
Can 3M vision strips be excluded from the low-emitting materials calculations?
LEED Interpretation ID# 10421 for ASHRAE 90.1-2010 Adjusted Point Scale for LEED v2009 Projects
CS-2009 EAc1:Optimize Energy Performanceposted by Silvia Ruiz on
Hi,
Following Strategy A but no D for regularly occupied space
NC-v4 EQc6:Interior lightingposted by Edgar Arevalo on
I'm working on a project, where indirect overhead lighting for a regularly occupied space (garbage truck maintenance garage space) would not be feasible due to height restrictions for vehicle
Occupant satisfaction score
EBOM-v4.1 EQp4:Indoor Environmental Quality Performanceposted by Amanda Medeiros on
Could you please give me more information about this equation 1. The occupant satisfaction score isn´t clear for me. What is the variance in occupant satisfaction level?
LEED v4.1 Life Cycle Analysis Documentation
posted by Isik Goren on
CI-v4 LTc3 - Access to quality transit - Question about "Bus Rapid Transit"
CI-v4 LTc3:Access to quality transitposted by Don Blair on
If a lane in a public street is signed with the wording "Bus Lane Ahead" and "Bus Lane" (those phrases are written on the pavement) but cars are not technically prohibited from&
IN vs. Exemp Performance Documentation Review
NC-v4 INc1:Innovationposted by Tracy Jordre on
We would like to wait until the Prelim Construction Submittal to submit our Innovation credits for review. In our preliminary design submittal, we did not mark the Innovation credit as “ready