Water BodiesSchools-2009 SSc1: Site Selectionposted by PAULA HIDALGO on Jan 31, 2013, 8:35 am
I have a school project that is actually the reconstruction of the school in the same site that it was previously located. This site limits with a river (the school auditorium is practically over... Last reply: Tristan Roberts, Jan 31, 2013, 11:54 am |
|
US Military Installation AbroadSchools-2009 SSc1: Site Selectionposted by Denise Shimabukuro on Jan 9, 2013, 10:19 pm
If the project is located in a foreign country on a US Military Installation, is this considered to be within the US? Technically, the APO Zipcode is California. Last reply: Tristan Roberts, Jan 31, 2013, 9:23 am |
|
Undeveloped land- definitionSchools-2009 SSc1: Site Selectionposted by Gendel Metlitsky on Jul 12, 2011, 11:00 am
The 3.5 acre project site is wooded with mature trees. It was developed years ago, but all structures were demolished 40-50 years ago. Should this site to be considered developed or... Last reply: Tristan Roberts, Nov 8, 2011, 3:34 pm |
|
Prime FarmlandSchools-2009 SSc1: Site Selectionposted by Keelan Kaiser on Jan 4, 2011, 9:40 am
I have reviewed the websoilsurvey site at nrcs.usda.gov and half of our site boundary includes... Last reply: Tristan Roberts, Jan 4, 2011, 10:25 am |
|
FEMA mappingSchools-2009 SSc1: Site Selectionposted by Dave Koons on May 7, 2010, 11:59 am
We have a school project in Southern California. The FEMA website has a map designation for that area, but it is listed as Zone D (Undetermined risk). Calls to the local county public works... Last reply: Tristan Roberts, May 12, 2010, 5:12 pm |